Skip to main content

Israel tolled lane projects delayed

The tender process for the construction of tolled lanes around Tel Aviv now looks set to be delayed. The additional lanes are planned to be built at key points on the network around Tel Aviv in a bid to cut congestion. An earlier project for a tolled lane in the Tel Aviv area, linking the Shappirim Interchange with the centre of the city, has proven highly successful at helping to reduce congestion levels. The three new sections are intended to further improve traffic flow in and around the city. These lane
August 10, 2018 Read time: 2 mins

The tender process for the construction of tolled lanes around Tel Aviv now looks set to be delayed. The additional lanes are planned to be built at key points on the network around Tel Aviv in a bid to cut congestion. An earlier project for a tolled lane in the Tel Aviv area, linking the Shappirim Interchange with the centre of the city, has proven highly successful at helping to reduce congestion levels. The three new sections are intended to further improve traffic flow in and around the city. These lanes would link the city with the Shefayim Interchange, Morasha Interchange and Rishon Lezion.

The tender documents for the three lanes could still be published in the fourth quarter of 2018, although this would be 12 months after the original timeline. The projects will all be handled under the PPP model. The work will include building two new parking lots and 110km of tolled lanes. Variable price tolling will be used, as with the existing lane.

Related Content

  • UK report suggests 30km Pennine tunnel with robotic maintenance
    December 2, 2015
    The UK could build one of Europe’s longest road tunnels as it considers route options for a new major link connecting the cities of Manchester and Sheffield in England. An interim report looking at how best to connect the cities suggested that the road could be between 40km-50km, depending on the route. It “will include a tunnelled section, which could range from between 20-30km, making it one of the longest road tunnels ever built”.
  • Cost effective road maintenance
    February 7, 2012
    Highway maintenance and repair is an easy target for cuts in highway budgets, but there are cost-effective measures that can be adopted as Patrick Smith reports
  • Cost effective road maintenance
    February 8, 2012
    Highway maintenance and repair is an easy target for cuts in highway budgets, but there are cost-effective measures that can be adopted as Patrick Smith reports. Road maintenance is an increasingly important industry that spans a worldwide market. Awareness of the need for a stable and sustainable international infrastructure, maintenance and creative rural road technologies are taking a stronger role as viable sources for a cost-effective means of preserving, developing and prolonging the life of roads wit
  • US$153 million road upgrade underway in New Zealand
    April 15, 2024
    A US$153 million road upgrade project is now underway in New Zealand.