Skip to main content

Hamburg highway expansion programme

A €1.6 billion project is in hand in Germany to widen the A7 Autobahn between Bordesholm and Hamburg's tunnel Elbtunnel. Funding for the project is being provided jointly by the German Government, the city of Hamburg, the province of Schleswig-Holstein and the German engineering firm Deutsche Einheit Fernstraßenplanungs- und -bau (DEGES). The work should be complete by 2018. The project involves increasing the number of traffic lanes in the Schleswig-Holstein section from four to six and in Hamburg from six
May 20, 2015 Read time: 1 min
A €1.6 billion project is in hand in Germany to widen the A7 Autobahn between Bordesholm and Hamburg's tunnel Elbtunnel. Funding for the project is being provided jointly by the German Government, the city of Hamburg, the province of Schleswig-Holstein and the German engineering firm Deutsche Einheit Fernstraßenplanungs- und -bau (DEGES). The work should be complete by 2018. The project involves increasing the number of traffic lanes in the Schleswig-Holstein section from four to six and in Hamburg from six to eight, so as to boost capacity. Three bridges have already been removed, with a further three requiring demolition. The project will be the largest in the north of Germany once work is fully underway. This section of the A7 Autobahn is amongst the busiest routes in Germany.

Related Content

  • Busy bridge in Beijing replaced quickly
    March 31, 2016
    The replacement of a very busy road bridge in China’s capital Beijing has been carried out successfully. Due to the volume of traffic using the bridge during week days, the work had to be carried out quickly so as to minimise traffic disruption. But despite being carried out in the centre of Beijing, the replacement work for the Sanyuan Bridge just took 43 hours from start to completion.
  • Forming iconic structures
    July 18, 2012
    Specially designed and constructed formwork is being used to create some iconic bridges worldwide The Golden Ears Bridge over the Fraser River will unite the municipalities of Richmond, New Westminister and Delta in the scenic British Columbia province of Canada. The bridge, part of a CAD$800 million (US$670 million) project, is an 'extra dosed' cable stayed bridge, which means the deck will be supported by both cables and the structure itself. This design reduces the overall height of the two towers as req
  • VIDEO: Gap closed for Gordie Howe Bridge
    July 26, 2024
    A 26m gap in the deck was recently closed on the bridge that will connect Detroit in the US state of Michigan and Windsor in the Canadian province of Ontario.
  • London Lower Thames Crossing link
    October 10, 2018
    Progress is being made with regard to the proposed Lower Thames Crossing project close to London.