Skip to main content

Go-ahead for new Forth Road Bridge

Scottish MPs have voted overwhelmingly in favour of a replacement for the Forth Road Bridge that will protect a vital link in the strategic transport network.
March 1, 2012 Read time: 2 mins

Scottish MPs have voted overwhelmingly in favour of a replacement for the Forth Road Bridge that will protect a vital link in the strategic transport network.

The Forth Crossing Bill, introduced in November 2009, was praised by MSPs for bringing forward proposals for a world-class, 21st Century crossing to replace the existing 2,512m long bridge with a main span of over 1,000m as the main route for traffic across the Forth estuary to and from the capital Edinburgh.

Due to the deterioration of the main suspension cables and other ongoing maintenance issues the existing bridge, opened in 1964, cannot continue as the main crossing for cross-Forth traffic and may have to close to some vehicles by 2017. Under the current proposals it would be retained as a dedicated public transport corridor for buses, cycles and taxis.

An impression of how the new Forth crossing (right) could look

By protecting the strategically vital transport link, the FRC will secure over 3,000 jobs and economic revenue of £1.3 billion (€1.5 billion). It will also deliver significant additional economic benefits through the creation of hundreds of jobs and sub-contracting opportunities for local companies, estimated by the British Chambers of Commerce to be worth around £6 billion (€7 billion) to Scotland’s economy.

With the approval by the Scottish Parliament, the crossing is on track and on target to be successfully completed in 2016.


It is expected that the principal contract to build the bridge and connecting roads, at an expected cost of £0.9 billion to £1.2 billion (€1 billion-plus to €1.4 billion), will be awarded in April, 2011 with the additional major contracts to upgrade the M9 Junction 1a and deliver ITS in the County of Fife awarded soon after.

The Forth road crossing will be the third major structural crossing of the lower Forth and will sit alongside the iconic Forth rail bridge and Forth Road Bridge from the 19th and 20th centuries.

Related Content

  • New study suggests Fehmarn Belt payback close to 50 years
    October 9, 2015
    A study by Danish consultant Hans Schjær-Jacobsen has shown that the payback period for the proposed Fehmarn Belt Fixed Link tunnel project between Denmark and Germany will be close to 50 years. This is a decade longer than estimated by the developers of the project which focusses on a 17km immersed tunnel, the study noted. The Fehmarn Belt Fixed Link will connect the German island of Fehmarn with the Danish island of Lolland. The 17km tunnel, including two railway tunnels, two motorway tunnels and an
  • Two new tunnel links for Turkey
    August 28, 2013
    Two new tunnel connections in Turkey will improve transport in key areas. The new Kemerhisar-Pozanti Highway features tunnels along its length and this key route will improve connections between the country’s capital Ankara and its commercial centre Istanbul as well as to the south-east of the country. The highway will have wider benefits too as it will allow better transportation through Turkey between Europe and the Middle East. And in the busy port city of Izmir, the new Konak Tunnel will reduce jour
  • Rotenberg’s Mostotrest to fight for $5 billion Russia’s road-building contract
    December 2, 2013
    Interest is strong in one of Russia’s premier projects for road infrastructure - Eugene Gerden reports The State Company Russian Highways (Avtodor) has officially announced a tender for the construction of the sixth - and longest - section of the Moscow - St Petersburg highway. Avtodor is Russia’s leading company in the field of development of national road infrastructure, while this is one of the largest and most controversial projects in Russian road building in recent years. The 6th section of the
  • Skanska wins major A46 upgrade in England
    September 2, 2022
    Construction on the deal worth almost €404.5 million is scheduled to start in 2025.