Repairs will be carried out to 150 steel bridges currently in poor conditions, while modular steel bridge components are being bought from a supplier in the Czech Republic.
The US firm Acrow Bridge has already supplied around 100 steel bridges to Ghana for use in improving connections to a number of towns and villages.
Ghana does have problems with the condition of some of its key bridges. Structures at Buipe and Yapei previously had to be closed due to concerns over their poor condition.



