Skip to main content

Germany plans replacement for A40 Neuenkamp Duisburg Bridge

Germany’s motorway authority has unveiled plans for an 802m cable stayed replacement bridge taking the A40 over the Rhine River near Duisburg. The state owned authority Deges - Deutsche Einheit Fernstraßenplanungs- und -bau - will oversee the project that includes an eight-lane expansion of the A40, all in the industrial Rhur region.
March 6, 2018 Read time: 2 mins
Germany’s longest cable stayed bridge, the proposed replacement A40 Neuenkamp Duisburg crossing (photo: Keipke Architekten)
Germany’s motorway authority has unveiled plans for an 802m cable stayed replacement bridge taking the A40 over the Rhine River near Duisburg.


The state owned authority Deges - Deutsche Einheit Fernstraßenplanungs- und -bau - will oversee the project that includes an eight-lane expansion of the A40, all in the industrial Rhur region.

"We hope that there will be a planning approval decision in 2019. Only then can we start with the tenders,” said Karl-Heinz Aukschun, Deges project manager.

If so, construction could start in 2020 and the bridge open by 2023 after which the old bridge will be demolished. The entire project including highway expansion should be complete by 2026.

Estimated cost will be €340 million for the bridge alone, whose main span between the two piers will be 380m, making it Germany’s longest cable stayed bridge.

According to Deges, the bridge will carry 126,000 vehicles a day by 2030, although the bridge’s capacity will be 150,000 vehicles daily. Lifespan will be up to 100 years.

The existing 775m-long Neuenkamp Bridge was completed in 1971 and was designed to carry 30,000 vehicles daily. However, for several years it has been carrying around 110,000 vehicles a day, including 11,000 trucks, according to media reports.

The old bridge’s decks were resurfaced 10 years ago. But since then, the structure has been closed on occasions for emergency welding to repair cracks. At other times, weight restrictions have been put in place for trucks.

Questions have already been raised about land acquisition for the A40 highway expansion as well as over the steel to be used for the bridge. Critics have wanted to know if the steel will come from Germany or China.

Udo Pasderski, Deges area manager, said steel will be purchase that gives best value for the citizens. "We always have to accept the most cost-effective offer in Europe-wide tenders," he said.

However, construction of the A1 Rhine bridge near Leverkusen, which will probably begin in 2019, will use Chinese steel.

Related Content

  • Mexico's new RCC concrete road
    November 9, 2017
    CEMEX is supplying a special grade of concrete for use on a busy logistics centre in Mexico. The order has been for 21,500m3 of roller compacted concrete (RCC) to pave all of the roads for the new terminal of ALA Transportes, a division of Grupo Transportes de Monterrey (GTM) - the largest trucking company in Mexico. The trucking firm needed a tough and durable concrete grade to be able to cope with the loads exerted by the movements of around 400 heavily laden trailers/day at the facility.
  • CT Ictas and Astaldi submit complaint over Peljeski Bridge award
    February 14, 2018
    Croatian media are reporting a dispute between two consortia and that of the China Road and Bridges over the Peljeski bridge project. Croatia’s national roads company Hrvatske Ceste chose China Road and Bridges but the decision is being challenged by a consortium led by the Italian firm Astaldi and one by Turkish CT Ictas. The two consortia submitted their complaints to the Croatian State Commission for Control of Public Ordering Processes in January only days after similar action by another consortia led
  • Treating Russia’s bridges
    April 11, 2013
    Russia is home to all of the world’s climatic zones and to over 6,000 bridges. Rain and wind, sun and heat, snow and ice mean that the Russian weather is extreme, and because its bridges need special protection their structural elements are insulated with bituminous sheeting. Evonik says that temperature stability and long life are key criteria for selecting insulating materials, and this has led to an increase in the use of special sheeting, some of which has been modified with its Vestoplast product. Ove
  • Over 1/3rd of US bridges needing repair or replacement
    April 15, 2020
    Over 1/3rd of US bridges are needing repair or replacement according to a new report.