Skip to main content

Florida Turnpike improvements underway

A series of improvement works are being carried out in various parts of Florida, in a bid to improve traffic flow. Florida Department of Transportation (FDOT) is starting work to widen the 11km stretch of Florida Turnpike between Boynton Beach Boulevard and Lake Worth Road. This project will see the highway stretch being widened so that it boosts capacity, with the Hypoluxo Bridge also having to be rebuilt accordingly. The projected cost is US$168 million and the work is intended to cut congestion at peak
September 18, 2019 Read time: 2 mins
A series of  improvement works are being carried out in various parts of Florida, in a bid to improve traffic flow. 2697 Florida Department of Transportation (FDOT) is starting work to widen the 11km stretch of Florida Turnpike between Boynton Beach Boulevard and Lake Worth Road. This project will see the highway stretch being widened so that it boosts capacity, with the Hypoluxo Bridge also having to be rebuilt accordingly. The projected cost is US$168 million and the work is intended to cut congestion at peak periods, improving journey times for drivers.


Elsewhere in the state, FDOT recently opened new lanes for the Beachline Expressway/SR 528 from I-4 to the Turnpike. This section now features two express lanes as well as an auxiliary lane in each direction. The improved section from the Turnpike to McCoy Road is also scheduled to open shortly. The work includes intersection improvements and is costing $170 million, while it is intended to boost capacity and safety, as well as cutting congestion and journey times for drivers.

FDOT is also evaluating the potential for road improvements between US 17/SR 35 and SR 60 in Polk County.

In addition, Florida’s Turnpike Enterprise recently began collecting all-electronic, no cash tolls at the southbound Sawgrass Expressway entrance ramp from Pat Salerno Drive. Tolls are now being collected using an overhead toll gantry system.

For more information on companies in this article

Related Content

  • Florida expressway construction on track
    January 11, 2021
    Construction work on a Florida expressway is on track.
  • Qatar expressway deal for South Korean firm
    February 6, 2017
    South Korean company Daewoo E&C will carry out upgrading and widening of a major expressway in Qatar. The US$590 million contract is focussing on widening a 4.5km stretch of the E-Ring expressway, as well as building 4km of connecting roads and three large intersections. The work on the intersections will be particularly complex as these will feature multiple levels. Improving the expressway will help boost connectivity for Qatar and is intended to improve traffic flow at peak periods. The construction work
  • Controversial Russian bridge opens
    August 10, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link having been opened to use by cars and buses. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Russian-manufactured Kamaz truck to reach the city of Kerch.
  • New tunnel Acapulco Bay in Mexico
    May 25, 2016
    Acapulco is to benefit from a new tunnel route to cut congestion. A new road tunnel close to Acapulco Bay will help cut journey times for drivers in this part of Mexico. Both tourists and locals in Acapulco Bay currently experience long journey times at present, with a key problem being congestion on the 12km route from Juan N Alvarez International Airport to the Acapulco Bay beaches. During peak traffic times the journey along the scenic, winding road around the tip of the Cumbres de Llano Largo Mountain t