Skip to main content

First deck span completed for Mersey Gateway's north approach viaduct

The Mersey Gateway Project achieved another milestone as the first deck span for the elevated north approach viaduct was completed. The reinforced concrete deck span was revealed when Merseylink's movable scaffolding system (MSS) 'Trinity' moved to its second casting position. It is the first of 11 spans that will be cast by the MSS for the deck of the elevated approach viaduct on the north side of the River Mersey.
February 12, 2016 Read time: 2 mins

The 6126 Mersey Gateway Project achieved another milestone as the first deck span for the elevated north approach viaduct was completed.

The reinforced concrete deck span was revealed when Merseylink's movable scaffolding system (MSS) 'Trinity' moved to its second casting position. It is the first of 11 spans that will be cast by the MSS for the deck of the elevated approach viaduct on the north side of the River Mersey.

The MSS, which acts as a giant concrete mould, was specially designed for the Mersey Gateway Project. It is being used to build the two elevated approach viaducts over the Mersey estuary.

The span connects the beginning of the approach viaduct from the north abutment in Widnes to the first supporting pier. It measures around 60m long and 18m wide and is angled at 5 degrees to allow vehicles to travel safely around the curve of the approach road.

Construction teams worked around the clock to get the span ready. This involved pouring 1,146m3 of concrete into the MSS non-stop over 34 hours.


"This is a real achievement for the project and a milestone that we've been looking forward to with anticipation,” said Declan Cannar, Merseylink's general foreman in charge of the MSS operation. “We're now busy preparing the MSS so it's ready to cast the next section."

The approach viaduct deck is being constructed in three phases. The deck spans are constructed first by the MSS, then a deck slab is built on top of the span, and finally the outer deck or ‘wings' are built by a wing traveller machine to provide the full six lane width of the approach road.

The MSS has moved to its second casting position ready for work to begin on the next span, which will be cast in March.

View Trinity in action by clicking here.
%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.merseygateway.co.uk/live-view Visit www.merseygateway.co.uk/live-view false http://www.merseygateway.co.uk/live-view false false%>

For more information on companies in this article

Related Content

  • ARTBA launching student video competition for 2015
    February 18, 2015
    The American Road & Transportation Builders Association (ARTBA) is running its annual student video competition. This is set up to challenge students of all ages to produce a two-to-four minute video about America’s transportation infrastructure. World Highways continues to support this competition and has also posted links to those videos from past winners and runners up on its websites in previous years. The ARTBA Student Video Competition is now in its fifth year. The aim of the competition is to raise a
  • Ascorel introduces MC602 anti-collision system at INTERMAT 2012
    January 6, 2017
    Ascorel’s systems for preventing crane collisions can now manage mobile as well as tower cranes. The new version of the MC602 has been designed for optimised management of mobile cranes. The latest developments focus on the automation of the machine positioning and on the optimisation of cranes’ workspaces.
  • Ascorel introduces MC602 anti-collision system at INTERMAT 2012
    February 3, 2012
    Ascorel’s systems for preventing crane collisions can now manage mobile as well as tower cranes. The new version of the MC602 has been designed for optimised management of mobile cranes. The latest developments focus on the automation of the machine positioning and on the optimisation of cranes’ workspaces.
  • Guntert and Zimmerman slipform paver lands in Europe
    January 6, 2017
    Guntert & Zimmerman (G&Z) has launched the new S600 multi-purpose concrete slipform paver at INTERMAT. According to company spokesperson David Lipari, the S600 is designed to address the markets shift from large dual lane, mainline paving jobs to smaller cut-up projects. “The S600 is designed to fulfill the need for a small or medium, versatile, multi-purpose paver that retains the ability to achieve good smoothness numbers,” said Lipari.