Skip to main content

First deck span completed for Mersey Gateway's north approach viaduct

The Mersey Gateway Project achieved another milestone as the first deck span for the elevated north approach viaduct was completed. The reinforced concrete deck span was revealed when Merseylink's movable scaffolding system (MSS) 'Trinity' moved to its second casting position. It is the first of 11 spans that will be cast by the MSS for the deck of the elevated approach viaduct on the north side of the River Mersey.
February 12, 2016 Read time: 2 mins

The 6126 Mersey Gateway Project achieved another milestone as the first deck span for the elevated north approach viaduct was completed.

The reinforced concrete deck span was revealed when Merseylink's movable scaffolding system (MSS) 'Trinity' moved to its second casting position. It is the first of 11 spans that will be cast by the MSS for the deck of the elevated approach viaduct on the north side of the River Mersey.

The MSS, which acts as a giant concrete mould, was specially designed for the Mersey Gateway Project. It is being used to build the two elevated approach viaducts over the Mersey estuary.

The span connects the beginning of the approach viaduct from the north abutment in Widnes to the first supporting pier. It measures around 60m long and 18m wide and is angled at 5 degrees to allow vehicles to travel safely around the curve of the approach road.

Construction teams worked around the clock to get the span ready. This involved pouring 1,146m3 of concrete into the MSS non-stop over 34 hours.


"This is a real achievement for the project and a milestone that we've been looking forward to with anticipation,” said Declan Cannar, Merseylink's general foreman in charge of the MSS operation. “We're now busy preparing the MSS so it's ready to cast the next section."

The approach viaduct deck is being constructed in three phases. The deck spans are constructed first by the MSS, then a deck slab is built on top of the span, and finally the outer deck or ‘wings' are built by a wing traveller machine to provide the full six lane width of the approach road.

The MSS has moved to its second casting position ready for work to begin on the next span, which will be cast in March.

View Trinity in action by clicking here.
%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.merseygateway.co.uk/live-view Visit www.merseygateway.co.uk/live-view false http://www.merseygateway.co.uk/live-view false false%>

For more information on companies in this article

Related Content

  • 5% off for customers at JCB’s silver anniversary second-hand machinery auction
    February 18, 2014
    JCB is celebrating the silver anniversary of famous second-hand machinery auction - by offering a birthday 5% discount bonus to bidders at the next sale. The company is giving the discount for every lot that goes under the hammer at the event on Tuesday 8 April 2014 at JCB’s World Headquarters in Staffordshire, central England. And unlike many auctions of its kind, the JCB Great Auction Sale also has no buyer’s premium – saving up to a further 10% for customers. Auction organiser Phil Pepper said, “Sin
  • Bonfiglioli is launching heavy duty drives for large machines
    January 6, 2017
    Bonfiglioli Trasmital has developed a new series of travel drive gearboxes for use in large, heavy duty tracked machines. The firm is now offering three new product sizes, the 722C, 724C and 726C, which extend its range of tracked travel drives. The 722C develops a maximum torque of up to 330,000Nm, making it suitable for use on excavators of 120-150tonnes, as well as cranes and drilling rigs of 180-230tonnes. The 724C develops a maximum torque of up to 450,000Nm, and is specially designed for large cranes
  • Bonfiglioli is launching heavy duty drives for large machines
    March 8, 2013
    Bonfiglioli Trasmital has developed a new series of travel drive gearboxes for use in large, heavy duty tracked machines. The firm is now offering three new product sizes, the 722C, 724C and 726C, which extend its range of tracked travel drives. The 722C develops a maximum torque of up to 330,000Nm, making it suitable for use on excavators of 120-150tonnes, as well as cranes and drilling rigs of 180-230tonnes. The 724C develops a maximum torque of up to 450,000Nm, and is specially designed for large cranes
  • Ormet’s experienced lifting and handling solutions
    January 6, 2017
    The Ormet Group has an impressive 40 years of experience in the world of lift and handling. One of its divisions, Jekko, manufactures high quality self-propelled crawler minicranes, minipickers and vacuum technology. Overmat, another Ormet Group division, manufactures high quality automatic self-propelled mixers for construction and other equipment for handling and logistics of the modern construction site.