Skip to main content

Ferrovial consortium secure US$344.39mn Oman motorway construction deal

The Government of Oman has awarded the Ferrovial-Federici Stirling Batco consortium a US$344.39 million (OMR 132.6 million) contract to construct a 41km section of Oman’s Batinah Expressway. According to an Oman national newspaper the package, the fifth of six construction packages associated with the project includes three major bridge works taking the expressway across large wadis. The bridges will contain as many as 20 spans - each with a length of up to 40m.
August 27, 2013 Read time: 1 min
The Government of Oman has awarded the 2717 Ferrovial-Federici Stirling Batco consortium a US$344.39 million (OMR 132.6 million) contract to construct a 41km section of Oman’s Batinah Expressway.

According to an Oman national newspaper the package, the fifth of six construction packages associated with the project includes three major bridge works taking the expressway across large wadis. The bridges will contain as many as 20 spans - each with a length of up to 40m.

Seen as vital for developing the region's economic potential, the265km-long Batinah Expressway is expected to reduce the travel time between Muscat and UAE border by at least an hour.

The expressway is an extension of the 53km-long Muscat Expressway (which was built by the Muscat Municipality).

For more information on companies in this article

Related Content

  • Louis Berger wins key India bridge deal
    January 10, 2018
    Louis Berger has been awarded the management contract for the Versova-Bandra Sea Link project in India. The US$17 million project management services deal was awarded to the firm by the Maharashtra State Road Development Corporation (MSRDC). The construction of the Versova-Bandra Sea Link (VBSL) is estimated to cost some $1 billion and will take 54 months to complete. “We are honored to play a major role in one of the largest infrastructure projects — not just in Mumbai, but in India,” said Kshitish
  • Bridge design using flow modelling techniques
    February 17, 2012
    SBG has set numerous engineering precedents with its hugely innovative Jamarat Bridge project in Saudi Arabia
  • Study for Dallas road development project
    July 14, 2016
    The Texas Department of Transportation (TxDOT) awarded a US$2.75 million contract for a study to develop the corridor along a stretch of Interstate 635 (I-635) in Dallas. The two-year contract is for schematic, environmental and traffic studies for the construction of access roads along the growing section of highway and was awarded to Michael Baker International. As part of the contract, the Michael Baker team will conduct a number of detailed studies in advance of TxDOT’s plans to add more than 53km of
  • Doka delivers cantilevering for super-slim piers at Lahntal Bridge
    October 21, 2016
    Doka’s formwork expertise is currently in demand during the construction of one of the busiest motorway viaducts in Germany. The 400m six-lane Lahntal Bridge in Limburg dates from the early 1960s. Every day about 100,000 vehicles cross the bridge that spans the valley of the River Lahn. But traffic loads have increased sharply, so a new bridge is being built sited just a few metres west of the old viaduct. The new Lahntal viaduct will measure a massive 43.5m in width, enabling eight lanes plus hard shoul