Skip to main content

Explosive demolition fells old bridge in Mississippi

A demolition contractor used 180kg of explosives to bring down an old bridge structure in the US state of Mississippi. The Big Ridge Road Bridge in D’Iberville was demolished as part of a project as part of a US$41 million project to construct a new interchange. Work on the interchange is expected to be complete in 2015. The work is being carried out for the Mississippi Department of Transportation.
June 23, 2014 Read time: 1 min
A demolition contractor used 180kg of explosives to bring down an old bridge structure in the US state of Mississippi. The Big Ridge Road Bridge in D’Iberville was demolished as part of a project as part of a US$41 million project to construct a new interchange. Work on the interchange is expected to be complete in 2015. The work is being carried out for the 1500 Mississippi Department of Transportation.

For more information on companies in this article

Related Content

  • VIDEO: Gap closed for Gordie Howe Bridge
    July 26, 2024
    A 26m gap in the deck was recently closed on the bridge that will connect Detroit in the US state of Michigan and Windsor in the Canadian province of Ontario.
  • Pre-stressed bridge decks use modular formwork system
    July 9, 2012
    Imaginative formwork, often using modular components, is helping to shape some challenging bridges worldwide. Patrick Smith reports Traffic volumes in and around Prague have swollen massively in recent years, pushing the existing road network to the limits of its capacity. To permanently ease congestion in the Czech capital's centre, a multi-lane orbital motorway is under construction as a high capacity bypass for central Prague and to link up all the motorways and other major highways radiating from the ci
  • Colombia’s troubled Hisgaura Bridge
    October 22, 2024
    Maintenance is planned for Colombia’s troubled Hisgaura Bridge.
  • Machine control technology shortens road contract
    May 28, 2013
    The use of sophisticated machine control technology has helped halve the schedule required for a road contract – Jeff Winke. By using the latest machine control systems on the equipment fleet, a US contractor has managed to halve worker hours, machine time and overall costs. “We chopped 50% off the contract schedule,” said Jim Swenson, licensed professional land surveyor for Oregon Mainline Paving based in McMinnville, Oregon. “The project was completed a year ahead of the two-year schedule,” he explained