Skip to main content

Ecuador bridge project planned

In Ecuador plans are being drawn up for a new bridge connecting Duran with the port city of Guayaquil. The bridge will span the Guayas River and is expected to cost US$800 million to build. The project had been proposed by the former administration but stalled and has now been revived by the current administration. The link would provide a new connection for Highway 40, cutting journey times considerably. The planned location for the new bridge has not so far been clarified.
October 16, 2017 Read time: 1 min

In Ecuador plans are being drawn up for a new bridge connecting Duran with the port city of Guayaquil. The bridge will span the Guayas River and is expected to cost US$800 million to build. The project had been proposed by the former administration but stalled and has now been revived by the current administration. The link would provide a new connection for Highway 40, cutting journey times considerably. The planned location for the new bridge has not so far been clarified.

Related Content

  • $250 million for Oregon-Washington bridge replacement
    July 10, 2025
    Oregon and Washington will provide $250 million for the Hood River-White Salmon Bridge replacement.
  • Republic of the Congo-Democratic Republic of the Congo bridge connection
    June 11, 2019
    The plan to build a bridge linking the Democratic Republic of the Congo (DRC) with the Republic of the Congo has stalled once more. The road/rail bridge bridge is intended to provide a better connection between the DRC and the Republic of the Congo. The bridge would be around 4km long and the project was first proposed some years ago and the project to build the structure was restarted in 2017. However it now faces opposition in the DRC from Congo Uni/ABSL. According to this group, building the bridge would
  • Landmark bridge for Italy?
    August 9, 2023
    The news that the Italian Government is once again considering building a bridge spanning the Messina Strait is of major significance for the construction sector, as well as for the country.
  • Controversial Russian bridge opens
    August 10, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link having been opened to use by cars and buses. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Russian-manufactured Kamaz truck to reach the city of Kerch.