Skip to main content

Drainage for new Wear Crossing in UK

In the UK the Lanes Group is carrying out the contract to build specialist drainage for the New Wear Bridge in Sunderland. The Lanes Group will carry out this work for the joint venture partners building the new bridge link.
January 21, 2016 Read time: 2 mins
The new Wear bridge will improve transport connections around Sunderland
RSSIn the UK the 7891 Lanes Group is carrying out the contract to build specialist drainage for the New Wear Bridge in Sunderland. The Lanes Group will carry out this work for the joint venture partners building the new bridge link.

Personnel based at the Lanes depot in Newcastle have begun carrying out drainage work for the €152.7 million (£117.6 million) bridge project. This is the second major bridge building project Lanes Group has been contracted to work on in recent months. The company is also providing specialist drainage support for the Mersey Gateway Project, the new bridge spanning the River Mersey between Runcorn and Widnes.

The New Wear Bridge is being built across the River Wear between the districts of Wessington and Pallion, and is designed to improve transport links between Sunderland city centre, the Port of Sunderland, the A19 and the wider region.

The three-span cable stay bridge, which is due to open in spring 2018, will also open up new development sites at either end. Lanes Group won a competitive tender to become the sole drainage contractor for the joint venture partners, Farrans Construction and Victor Buyck Steel Construction. Tasks already carried out by personnel from Lanes include desilting drainage pipes and carrying out CCTV drainage surveys.

The New Wear Bridge will be 336m long and will have a central A-frame cable pylon rising to 105m.

For more information on companies in this article

Related Content

  • Advanced technologies will increase the wear life of bitumen further
    February 28, 2012
    Bitumen has been used for thousands of years, but now a wide variety of products are available that can be added to it to produce blends with improved properties. According to the Refined Bitumen Association (RBA) bitumen is the oldest known engineering material. Indeed, the organisation says that its versatility as a construction material is unparalleled, and having been used as an adhesive, sealant and waterproofing agent for over 8,000 years, its uses include the construction and maintenance of roads, ai
  • Ecuador’s new bridge to be built in sections
    July 31, 2018
    Ecuador is working on plans for the new South Crossing Bridge (SCB) spanning the Guayas River, to improve transport connections for the port of Guayaquil. The plans call for the SCB to be constructed in three sections, with the project expected to cost US$1.04 billion. The schedule calls for the link to be completed in 2022, with work starting in the third quarter of 2018. The project is being handled under 40-year concession deal that encompasses the bridge and highway links.
  • Oman deal for Turkish/Italian partners
    February 9, 2012
    The first phase of Oman's new Sur road project is now being carried out by a joint venture comprising Turkish contractor Ozkar Insaat (Ozkar) and Italian firm Astaldi.
  • Bangladesh’s Padma Bridge faces cost hike
    September 25, 2017
    The cost of the Padma Bridge Project in Bangladesh could rise by around US$173 million, according to a report by the Financial Express newspaper. A Planning Commission official said the money would be needed for compulsory purchase of nearly 2,6700 more hectares. Work started in 2014 and the project is likely to finish by the end of 2018.