Skip to main content

Demolition starts on Seattle’s Alaska Way Viaduct

Demolition of the Alaska Way Viaduct in the northwest US city of Seattle is underway, including the filling in of a redundant road tunnel.
June 14, 2019 Read time: 2 mins
Coming down: Demolition of Seattle’s Alaska Way Viaduct, a 1950’s structure, began this winter (pic courtesy Philip Renaud)

Demolition of the Alaska Way Viaduct in the northwest US city of Seattle in Washington State is underway, including the filling in of a redundant road tunnel.

Demolition contractor Kiewit Infrastructure West picked up the contract estimated at around US$94 million, according to media reports. Work is expected to take up to two years and includes filling in the Alaska Way’s Battery Street Tunnel.

For each segment of the viaduct, the contractor is removing the road decks, then girders and crossbeams and finally the support columns. During demolition, barriers are installed to protect nearby buildings and water is sprayed on the work to keep down dust.

Tunnel work includes decommissioning and removing the utility and mechanical systems, removal of hazardous material from the tunnel and, when finished, the sealing of the two entrances.

Kiewit decided against using conveyor belts to move the material into the Battery Street Tunnel. Instead, rubble is trucked to a nearby sorting area where rebar is removed. The material is crushed into small piece and loaded onto side-dumping trucks that carry the debris to openings along the tunnel route that lead directly down into the tunnel itself. The trucks dump the material into a steel funnel over the openings and down it goes into the tunnel. It takes less than a minute for the material to crash down into the tunnel where it is then levelled out by workers. Vibratory rollers spread and compact the material in layers.

Prior to the demolition work, there were public petitions to keep the Battery Street Tunnel open for pedestrian and bicycle use. However, the Washington State Department of Transportation decided that the structure, in need of repair,  would have been extremely expensive to upgrade to modern seismic standards – an important feature for any structure along the west coast of the US and up into Canada. The region lies along the infamous San Andreas Fault making it prone to earthquakes.

The new Alaska Way’s tunnel lies directly under the old viaduct and was the subject of a World Highways Key Project Report in 2017.

<%$Linker:

2

External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external https://www.worldhighways.com/categories/road-highway-structures/features/bertha-ends-her-alaskan-way-voyage-in-seattle/ false https://www.worldhighways.com/categories/road-highway-structures/features/bertha-ends-her-alaskan-way-voyage-in-seattle/ false false%>

 

Related Content

  • Element Six promises up to 40 times the life of standard milling machine picks
    February 7, 2013
    Element Six, the synthetic diamond division of DeBeers, has developed a revised design for its D Power road picks, claiming greatly extended working life. The D Power road pick will use a polycrystalline diamond (PCD) tip with an improved head design that incorporates tungsten carbide to provide greater protection to the steel pick mount. The company claims that the D Power road pick can deliver up to 40 times the life of a standard carbide pick, providing reduced downtime, increased efficiency and a better
  • GKD Tecknik showcases PWS
    January 6, 2017
    GKD Technik will be showing its PWS (Proximity Warning System) for the first time at Intermat 2012. Designed to protect site workers from being injured by mobile site machinery, the PWS system uses radio technology to detect the position of pedestrians and warn the machinery operator of the hazard. Each time a worker comes to close to a machine a log is generated and, using optional telemetry, the contractor can monitor site safety. Anti-collision facilities ensure that all mobile machines can detect the ha
  • GKD Tecknik showcases PWS
    April 13, 2012
    GKD Technik will be showing its PWS (Proximity Warning System) for the first time at Intermat 2012. Designed to protect site workers from being injured by mobile site machinery, the PWS system uses radio technology to detect the position of pedestrians and warn the machinery operator of the hazard. Each time a worker comes to close to a machine a log is generated and, using optional telemetry, the contractor can monitor site safety. Anti-collision facilities ensure that all mobile machines can detect the ha
  • First public outing for Liebherr tower crane at INTERMAT
    January 6, 2017
    Liebherr used INTERMAT 2012 to show its new 380 EC-B 16 Litronic flat-top crane. The 380tonne unit tops the 15-model range, which starts from 50tonnes. The new “flagship” can lift loads of up to 3,400kg at its 75m maximum radius. With the Litronic system, the 380 EC-B 16 can provide up to 20% more load lift at the push of a button. This is achieved by integrating the load-moment limiting system, the ABB operating-range limiting system and the MDA machine data evaluation program.