Skip to main content

Demolition starts on Seattle’s Alaska Way Viaduct

Demolition of the Alaska Way Viaduct in the northwest US city of Seattle is underway, including the filling in of a redundant road tunnel.
June 14, 2019 Read time: 2 mins
Coming down: Demolition of Seattle’s Alaska Way Viaduct, a 1950’s structure, began this winter (pic courtesy Philip Renaud)

Demolition of the Alaska Way Viaduct in the northwest US city of Seattle in Washington State is underway, including the filling in of a redundant road tunnel.

Demolition contractor Kiewit Infrastructure West picked up the contract estimated at around US$94 million, according to media reports. Work is expected to take up to two years and includes filling in the Alaska Way’s Battery Street Tunnel.

For each segment of the viaduct, the contractor is removing the road decks, then girders and crossbeams and finally the support columns. During demolition, barriers are installed to protect nearby buildings and water is sprayed on the work to keep down dust.

Tunnel work includes decommissioning and removing the utility and mechanical systems, removal of hazardous material from the tunnel and, when finished, the sealing of the two entrances.

Kiewit decided against using conveyor belts to move the material into the Battery Street Tunnel. Instead, rubble is trucked to a nearby sorting area where rebar is removed. The material is crushed into small piece and loaded onto side-dumping trucks that carry the debris to openings along the tunnel route that lead directly down into the tunnel itself. The trucks dump the material into a steel funnel over the openings and down it goes into the tunnel. It takes less than a minute for the material to crash down into the tunnel where it is then levelled out by workers. Vibratory rollers spread and compact the material in layers.

Prior to the demolition work, there were public petitions to keep the Battery Street Tunnel open for pedestrian and bicycle use. However, the Washington State Department of Transportation decided that the structure, in need of repair,  would have been extremely expensive to upgrade to modern seismic standards – an important feature for any structure along the west coast of the US and up into Canada. The region lies along the infamous San Andreas Fault making it prone to earthquakes.

The new Alaska Way’s tunnel lies directly under the old viaduct and was the subject of a World Highways Key Project Report in 2017.

<%$Linker:

2

External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external https://www.worldhighways.com/categories/road-highway-structures/features/bertha-ends-her-alaskan-way-voyage-in-seattle/ false https://www.worldhighways.com/categories/road-highway-structures/features/bertha-ends-her-alaskan-way-voyage-in-seattle/ false false%>

 

Related Content

  • Track stand tactics take top honours
    January 5, 2015
    Cyclists and vehicle drivers may have their differences on the road but they can, nonetheless, admire each other’s skills. The ability of an articulated truck driver to back up while threading his lengthy vehicle through a narrow passage is often admired by cyclists. Drivers, too, can admire the ability of a cyclist at a stop light to balance his bicycle while stationary, without taking his or her feet off the pedals, a feat called the track stand.
  • Plans are in hand for a key UK parking exhibition
    December 13, 2012
    Plans are well in hand for the Traffex and Parkex exhibitions being held in the UK. This bi-annual event is now in its 26th year, is a three day exhibition combining two trade shows, Traffex and Parkex. Traffex is an international traffic engineering, road safety, parking and highway maintenance exhibition. Meanwhile Parkex is Europe’s largest dedicated parking exhibition. The events are co-located and will take place in Hall 5 at the NEC Birmingham from 16th – 18th April 2013. Traffex and Parkex 2013 are
  • Terex’s ‘superstructure’
    January 6, 2017
    The 100tonnes capacity class Roadmaster 5300 Truck Mounted Crane is said by Terex to have an innovative superstructure and outrigger frame which allows it to be mounted on a commercially-built, rather than a custom, five-axle truck chassis.
  • Terex’s ‘superstructure’
    March 1, 2012
    The 100tonnes capacity class Roadmaster 5300 Truck Mounted Crane is said by Terex to have an innovative superstructure and outrigger frame which allows it to be mounted on a commercially-built, rather than a custom, five-axle truck chassis.