Skip to main content

Debating the future of the Forth bridge

A debate is now underway regarding the fate of the existing Forth Road Bridge in the Scottish capital Edinburgh. A new Forth Replacement Bridge is being planned at a cost of some €2.64 billion and once this opens, it will carry heavy vehicles, which will not be allowed over the current bridge. Excessive loading and corrosion have taken their toll on the current bridge, although measures to halt the cable corrosion in this suspension bridge have now been taken.
May 14, 2012 Read time: 2 mins
A debate is now underway regarding the fate of the existing Forth Road Bridge in the Scottish capital Edinburgh.

A new Forth Replacement Bridge is being planned at a cost of some €2.64 billion and once this opens, it will carry heavy vehicles, which will not be allowed over the current bridge. Excessive loading and corrosion have taken their toll on the current bridge, although measures to halt the cable corrosion in this suspension bridge have now
been taken.

When the new link opens, there are proposals to turn the existing bridge into a pedestrian and cycleway only, although there are questions over the high maintenance costs for such use.

Overall though, the fate of the Forth Road Bridge provides a case in point for all older bridges around the world. The existing bridge was designed in the 1950s and built to high engineering standards, opening to traffic in 1964. However the bridge now has to cope with considerably higher volumes of traffic than it was designed for. In addition, the maximum GVW of trucks using the bridge has more than doubled since the link was opened.

Related Content

  • Hyundai E&C is working on Turkey’s new third Bosporus Bridge
    July 10, 2013
    Hyundai Engineering & Construction (Hyundai E&C) is to head a consortium building the lateral towers, aprons and suspension cables for the new Bosporus crossing in Turkey. Hyundai E&C will work in a consortium with its partner SK Engineering & Construction on the US$697 million project to construct the 2.16km Third Bosporus Bridge. This suspension bridge will feature eight lanes for motor vehicle traffic as well as two rail lines. With a width of 59m it will be the widest bridge in the world that carries a
  • Brine spraying can boost winter road safety and cut materials costs
    February 16, 2015
    A study on the use of a brine sprayer on the A8 Autobahn in Germany has yielded valuable data - *Jo Rommeswinkel writes. Since 2007, Autobahnplus Services (a+S) has been providing the operation and maintenance services on the 52km concession Autobahn A8 between Munich and Augsburg in Bavaria, a region renowned for its severe winter maintenance conditions. The Munich Augsburg section comprises 48km of six-lane dual carriageway and 4km of four-lane dual carriageway. Part of the road surface consists of low-no
  • $303 million Lowell bridge replacement
    June 12, 2025
    Skanska is handling the $303 million Lowell bridge replacement in the US
  • Innovative formwork solution to bridge construction
    February 20, 2012
    Innovative solutions are being applied to the construction of bridge structures as Patrick Smith reports. RMD Kwikform Iberica has engineered and supplied specialist formwork and falsework for construction of the much-needed Monteporreiro Viaduct in northern Spain. The viaduct will connect Monteporreiro with the Benedictine Monastery of San Bieito Lérez on the other side of the river, and in the process will ease congestion in the nearby town of Pontevedra, diverting some 5,000 vehicles/day.