Skip to main content

Deadline soon for AfPA abstract submissions

The February 10 deadline is nearly here for abstract submissions for the 19th AfPA International Flexible Pavements Conference at the Brisbane Convention and Exhibition Centre in Australia.
By David Arminas February 7, 2023 Read time: 2 mins
Brisbane will host the 19th AfPA International Flexible Pavements Conference starting in October (image © Rudi1976/Dreamstime)

Abstracts submissions remain open only until February 10 for the 19th AfPA International Flexible Pavements Conference in Brisbane, Australia.

The event will be held from 30 October to 1 November 2023 at Brisbane Convention & Exhibition Centre and focus on the challenges and essential strategies that are needed to achieve the objective of “Safely Paving the way to Carbon Zero”, the conference theme.

It is increasingly clear that this transport network is also a major contributor to global emissions. At the same time, it is also vulnerable to climate change, with more extreme weather events testing its resilience. These facts present a challenge to the flexible pavement sector in Australia in the responsible management of the country’s infrastructure assets.

The AfPA International Conference 2023 provides the Australian road sector with an opportunity to explore these challenges and identify strategies to achieve the objective of carbon zero.

Conference themes include sessions around safer roads and more resilient roads – in particular how to implement climate change into design considerations to build resilient pavements, innovative maintenance solutions and practices to enhance resilience, durability and performance of pavements and finally best practice for asset owners for responding to natural disasters.

Construction Practices sessions will explore crumb rubber applications as well as materials, technologies and processes to extend pavement durability and notably best practice use of RAP/WMA.

Also, what will future roads look like and how will that affect design and performance?

The successful 2019 18th AAPA International Flexible Pavements Conference attracted 600 delegates. Now, the 2023 19th edition aims to bring together more than 700 delegates from all areas of industry both within Australia and from around the world. Bitumen suppliers, sprayed surfacing operators, infrastructure consultants, highway design engineers, construction contractors and many others within the sector will benefit from attending the event.

For more information, click here.

For more information on companies in this article

Related Content

  • Graphene-enhanced pavements join UK Live Labs programme
    September 1, 2020
    While some parts of the world are on pause, road construction and new technology trials are still underway, as these stories demonstrate - Kristina Smith reports
  • Global credit squeeze impacts Australia's road construction
    July 13, 2012
    Roads Australia steps up in policy debate as road construction feels the pinch of the credit squeeze, as Mark Bowmer (RA media director) reports Like all markets around the world, Australia is feeling the effects of the global credit squeeze and its impact on the delivery of major infrastructure projects such as roads. In Sydney, for example, lack of funding (both from government and private sources) is seen as the major stumbling block to the construction of a much-needed eastern extension to Sydney's main
  • Intertraffic 2020: going ahead despite coronavirus concerns
    March 3, 2020
    Green light remains for Amsterdam’s Intertraffic exhibition of traffic technology and mobility.
  • Australia responds to infrastructure funding challenge
    July 13, 2012
    The Global Financial Crisis (GFC) has drastically changed the way governments and the private sector is prepared to procure vital infrastructure projects, says Philip Davies Governments have responded to the GFC by focusing on long term investment in transport infrastructure and shorter term stimulus packages to kick-start economies. As these projects proceed, the focus will shift to maintaining and achieving maximum benefits from assets and future infrastructure funding. The Public Private Partnership (PP