Skip to main content

Czech highway project benefiting from ground support

In the Czech Republic work is now on-going to provide ground support for the last stretch of the D8 highway project. This section of the highway runs through the Ceske Stredohori Mountains. The work is needed to reduce the risk from mudslides along a specific stretch of the highway
August 6, 2012 Read time: 1 min

In the Czech Republic work is now on-going to provide ground support for the last stretch of the D8 highway project. This section of the highway runs through the Ceske Stredohori Mountains. The work is needed to reduce the risk from mudslides along a specific stretch of the highway. This work has been delayed however due to concern over the environmental aspects of the ground support required. The environment permit was withdrawn for a 30% section of the area requiring the ground support work, which will delay the project by three months or more and looks likely to increase overall costs. The ground support activity is continuing on the rest of the affected area in the mean time.

Related Content

  • Innovative new drainage solutions will help keep roads free from water
    October 2, 2014
    An array of new technologies will help optimise road drainage and minimise flooding risks - Mike Woof reports In the UK the specialist contractor Lanes Group has carried out extensive inspection work of the drainage systems for the M6 toll route around the city of Birmingham. A powerful zoom camera has been used to carry out the inspection work for Midland Expressway, which operates and maintains the 43km-long motorway, running from Coleshill to Cannock.
  • Waste-full paving in Australia
    November 18, 2022
    The use of waste materials in roads, including higher proportions of RAP, is gaining ground.
  • Benefits of bitumen technology research
    March 15, 2012
    Bitumen technology is benefiting from years of research and development - Kristina Smith. On a 2.7km loop of road in Auburn in Alabama, US, a lorry driver drives his triple-truck round and round. During his eight-hour shift, he will have covered 544km, with another driver waiting to take over from him for the next shift. Their mission is to seriously damage the road. This is the National Center for Asphalt Technology (NCAT), where sponsors from states and private companies pay to test out new materials and
  • Increasing costs of highways project delays
    May 15, 2012
    Costs are climbing for Catalonia’s Eix de la Conreria highway project in Spain. The B-500 project is now expected to cost €400 million, a jump of €30 million from the previous estimate made just six months ago. The new link will connect Barcelona with Baix Maresme and Valles and the start of work on the project is also now expected to be delayed until 2012. The project requires the construction of four lanes with two running in either direction and is at present in the design and environmental assessment s