Skip to main content

Crossing the Delaware

A new bridge is planned to cross the Delaware River in the US. The present Scudder Falls Bridge was built in 1959 and carries around 58,400 vehicles/day. With traffic expected to increase by 35% to 77,500 vehicles/day by 2030, the existing structure needs replacing.
February 6, 2012 Read time: 1 min
A new bridge is planned to cross the Delaware River in the US. The present Scudder Falls Bridge was built in 1959 and carries around 58,400 vehicles/day. With traffic expected to increase by 35% to 77,500 vehicles/day by 2030, the existing structure needs replacing. Construction of the new bridge at a cost of US$300 million is due to start in 2011 and be finished by 2013. Users can drive over the present structure without charge but the new bridge will be tolled, to help pay for its construction and is expected to cost around $0.75/car. The new bridge will have nine lanes for cars and trucks, up from the current four lanes, as well as having two dedicated bus lanes.

Related Content

  • Nepal's new pedestrian bridges
    March 22, 2012
    Improved pedestrian safety and smoother traffic flow will result from work being carried out by Nepal’s Department of Roads. The plan will see the construction of 15 pedestrian bridges along the Tinkune-Suryabinayak section of the Araniko Highway.
  • Malaysia’s massive road building project is advancing the use of technology
    August 10, 2020
    Malaysia’s huge Pan Borneo Highway project is benefiting from the use of some of the latest technologies in its planning, design and construction
  • Toll-tale market strength for leading tolling manufacturers
    May 22, 2014
    New major highway tolling solution supply contracts and the launch of cutting-edge tolling products have invigorated the global tolling technology market in the first half of 2014, as Guy Woodford reports Kapsch TrafficCom has been selected by North Tarrant Express (NTE) Mobility Partners LLC to provide the toll collection, intelligent transport and network communication systems for the NTE extension project in the US state of Texas. The NTE extension is approximately 16km long, and runs along I-35W north o
  • Rebuild project for historic Pennsylvania bridge
    September 10, 2015
    Rebuilding work is planned for a historic bridge in the US state of Pennsylvania to ensure it remains able to carry current traffic volumes. The work is being managed by consulting engineer Michael Baker International. Pennsylvania Department of Transportation (PennDOT) selected Michael Baker International for the US$5 million engineering and design project that will focus on the western spans of the Market Street Bridge in Harrisburg. Rehabilitating this critical traffic artery in Pennsylvania's capital re