Skip to main content

Crossing the Delaware

A new bridge is planned to cross the Delaware River in the US. The present Scudder Falls Bridge was built in 1959 and carries around 58,400 vehicles/day. With traffic expected to increase by 35% to 77,500 vehicles/day by 2030, the existing structure needs replacing.
February 6, 2012 Read time: 1 min
A new bridge is planned to cross the Delaware River in the US. The present Scudder Falls Bridge was built in 1959 and carries around 58,400 vehicles/day. With traffic expected to increase by 35% to 77,500 vehicles/day by 2030, the existing structure needs replacing. Construction of the new bridge at a cost of US$300 million is due to start in 2011 and be finished by 2013. Users can drive over the present structure without charge but the new bridge will be tolled, to help pay for its construction and is expected to cost around $0.75/car. The new bridge will have nine lanes for cars and trucks, up from the current four lanes, as well as having two dedicated bus lanes.

Related Content

  • Bridging the River Tisza
    February 7, 2012
    The Hungarian government has been investing heavily in extending and improving the country's motorway and trunk road network.
  • New UK road link planned
    August 25, 2020
    A new UK road project is being planned.
  • UK smart motorway work for M4 link
    September 16, 2019
    Highways England in the UK is carrying out major upgrade work for the busy M4 motorway, running west from capital London. In all 11 bridges are being replaced along a 51km stretch of the M4 between London and Reading. When complete, the current hard shoulder will have been rebuilt and resurfaced to allow traffic to use it as a live lane. The section carrying the heaviest traffic, between the M25 ring road around London and the main exit for Heathrow Airport, will be widened so that it will feature five la
  • Kazakhstan bridge project complete
    December 16, 2016
    The opening of a new bridge in Kazakhstan that spans the Irtysh River is now offering a shorter route for drivers. The link is 12.3km long and is now the longest such structure in Central Asia, while the project cost around US$157 million. Its length was necessary as the bridge crosses a floodplain area, with a channel that can widen considerably following periods of heavy rain. Located in the country’s Pavlodar region, the bridge cuts the route used previously by over 40km. The bridge is expected to carry