Skip to main content

Crossing the Delaware

A new bridge is planned to cross the Delaware River in the US. The present Scudder Falls Bridge was built in 1959 and carries around 58,400 vehicles/day. With traffic expected to increase by 35% to 77,500 vehicles/day by 2030, the existing structure needs replacing.
February 6, 2012 Read time: 1 min
A new bridge is planned to cross the Delaware River in the US. The present Scudder Falls Bridge was built in 1959 and carries around 58,400 vehicles/day. With traffic expected to increase by 35% to 77,500 vehicles/day by 2030, the existing structure needs replacing. Construction of the new bridge at a cost of US$300 million is due to start in 2011 and be finished by 2013. Users can drive over the present structure without charge but the new bridge will be tolled, to help pay for its construction and is expected to cost around $0.75/car. The new bridge will have nine lanes for cars and trucks, up from the current four lanes, as well as having two dedicated bus lanes.

Related Content

  • Transstroy’s ambitions for Sochi 2014 Olympics and beyond
    September 30, 2013
    Igor Pankin is CEO of Transstroy, one of Russia’s largest transport infrastructure construction companies, a part of Oleg Deripaska’s Basic Element group. Created in 1992, the company has completed major construction projects with a combined worth of more than €4 billion (RUB 121 billion) The Olympic motto, ‘Swifter, Higher, Stronger’, is very appropriate for the Sochi 2014 Winter Olympics – and not just in reference to the action in its stadiums and on its slopes. The city has been transformed from a small
  • New Hoover Bypass Bridge complete
    February 29, 2012
    Work on the new Mike O'Callaghan-Pat Tillman Memorial Bridge crossing the Colorado River and providing a road link between Nevada and Arizona has now been completed.
  • Consultation soon for Vancouver area’s Massey Tunnel replacement
    September 19, 2019
    The Canadian province of British Columbia could put options for a Massey Tunnel replacement out to consultation late this year or early next. A statement from the BC ministry of transportation and infrastructure said the government is in discussions with various stakeholders about which options it will put out for consultation. Whatever option is chosen to replace the ageing four-lane Massey Tunnel – be it a bridge or another tunnel – it will be will be either six or eight lanes, according to the gove
  • Causeway and immersed road for LagoonHull
    December 1, 2021
    The agency proposing the UK’s LagoonHull project says it’s development and construction costs could be between €1.2-2.4 billion.