Skip to main content

Cost increases for major Chilean highway project

The cost of Chile’s Vespucio Oriente highway project is increasing, while its completion also looks set to be delayed. A 13% budget increase is now required due to additional costs from a number of factors such as urban landscaping, according to Business News Americas. The Américo Vespucio Oriente (AVO) expressway is being built in Chilean capital Santiago and was originally expected to cost in the region of US$940 million. However Chile’s Public Works Ministry, MOP, has said that the route will now cost so
November 15, 2013 Read time: 3 mins
The cost of Chile’s Vespucio Oriente highway project is increasing, while its completion also looks set to be delayed. A 13% budget increase is now required due to additional costs from a number of factors such as urban landscaping, according to Business News Americas. The Américo Vespucio Oriente (AVO) expressway is being built in Chilean capital Santiago and was originally expected to cost in the region of US$940 million. However Chile’s Public Works Ministry, MOP, has said that the route will now cost some $1.06 billion. The project is for a 40-year concession package that includes building and operating a 9.3km underground expressway through Santiago. The route runs from El Salto Avenue to Príncipe de Gales Avenue, under the existing Américo Vespucio beltway. Because of the route, the project will be both complex and challenging and MOP also said that firms or joint ventures interested in participating in the tender will now have until December 30th 2013 to submit technical bids, compared to the previous deadline of November 22nd 2013. The ministry will then announce the economic proposals for the concession on January 20th 2014.

The new AVO route will be built on two levels, each one carrying a one-way, three-lane expressway. Road capacity will increase to 8,000 vehicles/hour. The project is required as Santiago suffers chronic congestion, particularly at peak periods. The authorities split the long-delayed AVO tender in two, given the complexity of the project, which will run through five municipalities in eastern Santiago. The new AVO route will provide the missing link in the city's beltway and was originally intended to run underground for 13km, joining El Salto with Grecia Avenue. However, this plan attracted strong protests from residents of the La Reina and Peñalolén districts. The 968 Chilean Government opted to split the project and call a tender only for the first 9.3km stretch. However in March 2014 Chile will have a new election and responsibility for the project will then be passed to whichever party wins. Opposition candidate for the presidency, Michelle Bachelet, has previously said she opposed the splitting of the tender and this could further add to the wrangling over the project, as well as adding additional delays.

For more information on companies in this article

Related Content

  • US bridge tender underway
    January 25, 2021
    The tender for a key US bridge upgrade is underway at present.
  • Transport Research announces new UAE Student Award initiative
    September 22, 2016
    Leading transport consultancy and research firm to recognize UAE's smartest students and their proposals for sustainable traffic solutions at Gulf Traffic 2016 September 21, 2016 The UK-based Transport Research Laboratory (TRL) has set up the TRL Student Award in the United Arab Emirates. The initiative will award some of the country’s top student minds for their proposals of innovative and sustainable transport solutions in a special awards ceremony on the sidelines of Gulf Traffic 2016, which wi
  • Increased use of recycled asphalt pavement
    February 29, 2012
    Increasing material costs mean that the US highway sector is looking to increase the use of recycled asphalt pavement (RAP). At the recent World of Asphalt conference and exhibition in Orlando, Florida, two presentations explained the latest developments.
  • Major Australian project being planned
    December 1, 2017
    A large infrastructure project is now being examined closely in Australia, in Victoria State. Melbourne’s massive North East Link in Victoria State will provide a new connection between the Eastern Freeway and the Ring Road at Greensborough. Costing US$13.14 billion to construct, the 26km link is expected to carry up to 100,000 vehicles/day when fully commissioned. The project will be complex and includes building a 5km stretch of tunnel, as well as adding additional lanes to the Eastern Freeway. The