Skip to main content

Consultation soon for Vancouver area’s Massey Tunnel replacement

The Canadian province of British Columbia could put options for a Massey Tunnel replacement out to consultation late this year or early next. A statement from the BC ministry of transportation and infrastructure said the government is in discussions with various stakeholders about which options it will put out for consultation. Whatever option is chosen to replace the ageing four-lane Massey Tunnel – be it a bridge or another tunnel – it will be will be either six or eight lanes, according to the gove
September 19, 2019 Read time: 3 mins

The Canadian province of British Columbia could put options for a Massey Tunnel replacement out to consultation late this year or early next.

A statement from the BC ministry of transportation and infrastructure said the government is in discussions with various stakeholders about which options it will put out for consultation.

Whatever option is chosen to replace the ageing four-lane Massey Tunnel – be it a bridge or another tunnel – it will be will be either six or eight lanes, according to the government website.

“The ministry is working closely with the newly-formed 5067 Metro Vancouver Mayors’ Task Force, indigenous groups, 3100 TransLink, local municipalities and other stakeholders to develop and evaluate crossing options. The target completion for this phase of work is the end of November 2019,” the statement said.

3100 TransLink is the greater Vancouver area’s public transportation network.

In July 2019, the Mayors’ Task Force endorsed a short list of six options, focusing on addressing significant off-peak congestion, managing peak congestion, and providing attractive options for transit and active transportation.

The three six-lane options are a bridge plus two traffic lanes and multi-use path (MUP) in the existing tunnel, a bored tunnel plus two traffic lanes and MUP in the existing tunnel and an immersed tube tunnel plus two traffic lanes and MUP in the existing tunnel.

The three eight-lane options are a bridge with MUP, a bored tunnel plus MUP in the existing tunnel and an immersed tube tunnel plus MUP in a new or the existing tunnel.

In September 2017, the newly elected BC government stopped the design-build-finance-operate-maintain procurement process for a proposed 10-lane 3km cable-stayed bridge costing US$2.8 billion. At the time, local media said the province would pay $1.65 million to two of the three shortlisted consortia which had already submitted bids for what is officially called the George Massey Tunnel Replacement project, Completion was scheduled for 2022.

One consortium was headed by Spanish company ACS and its local subsidiaries and included Star America Infrastructure Partners and Aecon. Another of the competing consortia comprised Kiewit, Macquarie and Vinci. The third was made up of Fluor, John Laing and SNC-Lavalin.

The plan had been to demolish the tunnel after the a new bridge is opened, although some nearby municipal and city mayors advocated upgrading and twinning the Massey Tunnel - originally called the Deas Island Tunnel when it was opened by Queen Elizabeth in 1959. It carries a four-lane divided highway under the south arm of the Fraser River estuary, joining the city of Richmond to the north with the municipality of Delta to the south.

Meanwhile, Safety and Reliability Improvements work continues on the old tunnel – Canada’s only road tunnel below sea level and which under the now defunct bridge scheme was to have been demolished. Crews have installed higher visibility raised pavement markings on the approaches to and through the tunnel. Roadway and tunnel lighting is being converted to the LEDs. Upgrades to the fire alarm, fire door, ventilation and electrical also continue apace, according to the provincial government.

For more information on companies in this article

Related Content

  • Montreal to expand bus rapid transit on Pie-IX Boulevard
    June 5, 2018
    The Canadian province of Quebec tendered this month for expansion of the Pie-IX Boulevard bus rapid transit system between the cities of Laval and Montreal. The provincial government will contribute US$304 million out of which around $23 million will be for 28 new buses, according to the Canadian Broadcasting Corporation. Construction of the 11km stretch could start by October with completion in 2022. Pie-IX Boulevard, named after Pius IX, a Catholic pope, is a major thoroughfare on the island of M
  • Progress on Serbia’s Zezeljev bridge replacement is slow
    August 30, 2017
    Construction of the Zezeljev rail and road bridge across the Danube River is facing further delays, according to the Serbian government. Work on the 470m-long new bridge was supposed to be finished by this month. But national elections and changes of government have hampered progress, Serbian media have reported. The original bridge was completed in 1961 as a single-track railway line and separate roadway between the cities of Novi Sad and Petrovaradin. NATO attacked the structure five times during its camp
  • Zipping up road lanes
    September 28, 2018
    QMB has a Lindsay Road Zipper on duty near Montreal. World Highways deputy editor David Arminas climbed aboard As vice president of Canadian barrier specialist QMB, based in Laval, Quebec, Marc-Andre Seguin is sanguine about the future for moveable barriers. On the one hand, it looks good. The oft-stated advantage of moveable barriers is that the systems are cheaper to install than adding a lane or two to a highway or bridge. Directional changes to lanes can boost volume on a road without disrupting tra
  • Hochtief to replace part of Schwelmetal Bridge in Wuppertal
    September 27, 2018
    Hochtief Infrastructure has signed a contract with DEGES Deutsche Einheit Fernstraßenplanungs und Bau to replace the Schwelmetal Bridge on Germany’s A1 highway in Wuppertal. The contract in the city’s Langerfeld district is worth around €28 million. It entails the demolition and new construction of two partial sections of the Schwelmetal Bridge that dates back to the 1960s. Construction will start in mid-2019. Traffic will continue to flow on the A1 and on the Deutsche Bahn rail tracks beneath the bri