Skip to main content

Colombia’s Toyo Tunnel project underway

Construction is ongoing for Colombia’s Toyo tunnel project in Antioquia. The tunnel is located between Giraldo and Canasgordas and some 120km from Medellin. The tunnel should open to traffic in 2024 if the project sticks to its planned schedule. The main tunnel section will measure some 9.85km-long although the project involves drilling side tunnels and emergency areas. The work is costing US$588.4 million.
September 14, 2018 Read time: 1 min
Construction is ongoing for Colombia’s 4868 Toyo tunnel project in Antioquia. The tunnel is located between Giraldo and Canasgordas and some 120km from Medellin. The tunnel should open to traffic in 2024 if the project sticks to its planned schedule. The main tunnel section will measure some 9.85km-long although the project involves drilling side tunnels and emergency areas. The work is costing US$588.4 million.


The highway project for which the Toyo Tunnel forms a key stretch is split into two main stretches. The first section includes 17 bridges, seven tunnels and 4.4km of road, with Antioquia Al Mar holding the concession. The second section measures 19.4km with 11 tunnels and 13 bridges. Colombia’s national Road Institute (Invias) will award the contract for this second section of the route at the start of 2019.

For more information on companies in this article

Related Content

  • Brazilian port tunnel project
    June 22, 2023
    A Brazilian port tunnel project is planned.
  • Thailand highway and bridge projects underway
    September 27, 2017
    Plans are being up in Thailand’s capital Bangkok for a new expressway project in a bid to cut the city’s chronic congestion problem. This new route would provide a connection between the Western Outer Ring Road and Rama II Road. The project is being planned by the Expressway Authority of Thailand (Exat). Financing for the project worth US$918.3 million will be provided by the Thailand Future Fund (TTF). The new route will include an elevated stretch from Rama II's traffic island towards the Western Outer Ri
  • Innovative, flexible bridge formwork systems
    February 14, 2012
    Innovative formwork systems have been used to construct a variety of bridge structures. Patrick Smith reports. As part of the work on Germany's new A4 autobahn near Eisenach, the contracting joint venture awarded the formwork contract for two of the three viaducts to Doka. What makes this assignment so special to the company is that although the two steel composite bridges each have very different cross-sections, the JV is using the same overslung composite forming carriage to pour the carriageway slabs of
  • STRABAG wins tricky Polish project
    May 2, 2012
    Austrian construction firm STRABAG has won a major road contract from Poland’s General Directorate for National Roads and Highways (GDDKiA). The deal is for the construction of a 40km section of the S8 Expressway between Walichnowy and Sieradz Poùudnie, some 240km to the south west of capital Warsaw.