Skip to main content

Colombia’s Toyo Tunnel project underway

Construction is ongoing for Colombia’s Toyo tunnel project in Antioquia. The tunnel is located between Giraldo and Canasgordas and some 120km from Medellin. The tunnel should open to traffic in 2024 if the project sticks to its planned schedule. The main tunnel section will measure some 9.85km-long although the project involves drilling side tunnels and emergency areas. The work is costing US$588.4 million.
September 14, 2018 Read time: 1 min
Construction is ongoing for Colombia’s 4868 Toyo tunnel project in Antioquia. The tunnel is located between Giraldo and Canasgordas and some 120km from Medellin. The tunnel should open to traffic in 2024 if the project sticks to its planned schedule. The main tunnel section will measure some 9.85km-long although the project involves drilling side tunnels and emergency areas. The work is costing US$588.4 million.


The highway project for which the Toyo Tunnel forms a key stretch is split into two main stretches. The first section includes 17 bridges, seven tunnels and 4.4km of road, with Antioquia Al Mar holding the concession. The second section measures 19.4km with 11 tunnels and 13 bridges. Colombia’s national Road Institute (Invias) will award the contract for this second section of the route at the start of 2019.

For more information on companies in this article

Related Content

  • More tenders for the Lower Thames Crossing
    April 2, 2021
    The winners will build 23km of road connecting to what will be the UK’s longest road tunnel.
  • Tanzania’s work on East Africa’s multi-national road project
    November 28, 2022
    Tanzania is kick-starting construction work on the missing link in East Africa's multinational road
  • New tunnel Acapulco Bay in Mexico
    May 25, 2016
    Acapulco is to benefit from a new tunnel route to cut congestion. A new road tunnel close to Acapulco Bay will help cut journey times for drivers in this part of Mexico. Both tourists and locals in Acapulco Bay currently experience long journey times at present, with a key problem being congestion on the 12km route from Juan N Alvarez International Airport to the Acapulco Bay beaches. During peak traffic times the journey along the scenic, winding road around the tip of the Cumbres de Llano Largo Mountain t
  • Tendering for new Chile-Argentina tunnel project
    March 21, 2019
    The tender process is open for the study into the planned Paso Las Lenas tunnel to connect Chile and Argentina. The study is expected to cost US$1.55 million and will be paid for by Chile’s O’Higgins Region. The tunnel will be some 11.5km long and the portal in Chile will be at an altitude of 2,020m while the entrance on the Argentine side will be at 2,364m, allowing it to be used throughout the year. The tunnel has an expected pricetag of some $1.67 billion to build, with the countries sharing the construc