Skip to main content

Colombia’s Tesalia Tunnel drive complete

Driving the bore for Colombia’s new Tesalia Tunnel is now complete. The 3.5km tunnel forms part of the Pacifico 3 road project.
By MJ Woof April 20, 2020 Read time: 1 min
Driving of the Tesalia Tunnel in Colombia is now complete - image courtesy © Vasile Bobirnac, Dreamstime.com

 

Now that that driving work is finished, the engineers will complete the lining of the tunnel and then carry out surfacing and installation of the lighting and ventilation systems. The tunnel is expected to be ready for traffic in 2021.

Work on the Pacifico 3 road project is well underway. The 146km route links Colombia’s Risaralda Department, Caldas Department and Antioquia Department. The project has so far cost US$989 million.

Related Content

  • Bratislava bypass and Karpaty tunnel completion set for 2030
    June 18, 2018
    Slovakia’s national motorway company NDS expects that the Bratislava bypass on the D4 motorway together with the Karpaty tunnel will be completed around 2030. The D4 motorway is part of the trans-European transport network and will connect with the planned R7 expressway linking western and eastern Slovakia, and the existing D1 and D2 motorways”. Apart from construction works on part of the D4 motorway, another two stretches are planned on this link, including the 3.6km stretch from Devinska Nova Ves t
  • Bratislava bypass and Karpaty tunnel completion set for 2030
    June 18, 2018
    Slovakia’s national motorway company NDS expects that the Bratislava bypass on the D4 motorway together with the Karpaty tunnel will be completed around 2030. The D4 motorway is part of the trans-European transport network and will connect with the planned R7 expressway linking western and eastern Slovakia, and the existing D1 and D2 motorways”. Apart from construction works on part of the D4 motorway, another two stretches are planned on this link, including the 3.6km stretch from Devinska Nova Ves t
  • Austria-Slovenia tunnel project awarded
    August 9, 2018
    Construction of the second tube of the Karawanks Tunnel connecting Austria and Slovenia is now going ahead. The work will be headed by Austrian contractors, ARGE Swietelsky Tunnelbau and Swietelsky Baugesellschaft. The 7.8km-long tunnel route runs under the Alpine Karawanks mountain range. The Austrian motorway operator Asfinag is investing around €168 million into the project, while the European Commission is providing €25 million. The work being carried out will include building new rescue routes as wel
  • Nepal's upgraded links
    May 25, 2012
    The Indian Government is providing assistance for road construction work in neighbouring Nepal. This assistance is for building the Kulekhani – Kathmandu road section, which will be widened and upgraded with an asphalt surface. The road will be widened to 7.5m and the work is being carried out by Indian Contractor Golden Goods. Meanwhile asphalt surfacing work is has now been completed on Nepal’s Hetauda-Bhimphedi-Kulekhani-Pharphing-Chaimale road Section. Surfacing work is in hand on the remaining 21km sec