Skip to main content

Colombia’s Tesalia Tunnel drive complete

Driving the bore for Colombia’s new Tesalia Tunnel is now complete. The 3.5km tunnel forms part of the Pacifico 3 road project.
By MJ Woof April 20, 2020 Read time: 1 min
Driving of the Tesalia Tunnel in Colombia is now complete - image courtesy © Vasile Bobirnac, Dreamstime.com

 

Now that that driving work is finished, the engineers will complete the lining of the tunnel and then carry out surfacing and installation of the lighting and ventilation systems. The tunnel is expected to be ready for traffic in 2021.

Work on the Pacifico 3 road project is well underway. The 146km route links Colombia’s Risaralda Department, Caldas Department and Antioquia Department. The project has so far cost US$989 million.

Related Content

  • Japanese loan aiding Nepalese tunnel project
    March 24, 2015
    The Nepalese Government is to receive a loan from the Japanese International Cooperation Agency (JICA) for a key tunnel project. The JICA loan is being offered at an interest rate of 1% for the next 40 years. The project is expected to cost in the region of US$150.1 million to construct. The new link will reduce traffic congestion on the existing Nagdhunga-Thankot road. Work is expected to commence in the next 18 months. The survey for the 2.5km tunnel has been carried out by the Department of Roads.
  • Asphalt resurfacing at Miami International Airport
    February 8, 2012
    Improvements worth US$30 million are being carried out at Miami International Airport. The work includes runway resurfacing with specialist contractors having been brought in to handle the project. This is a busy facility handling some 34 million passengers/year and the work is being carried out over a period of 454 days in all, starting in September 2009 and due to finish in December 2010. The focus of attention is the upgrade to the airport's second longest runway, 8R 26L as well as the adjoining M and N
  • Doka wins Fehmarnbelt Tunnel formwork deal
    November 17, 2022
    When completed in 2029, the Fehmarnbelt Tunnel between Denmark and Germany will accommodate a four-lane highway, as well as a two-track electrified rail line.
  • Hungary contract for STRABAG
    May 4, 2020
    Austrian contractor STRABAG has been awarded a key road contract for Hungary.