Skip to main content

Colombia’s new road links being planned

Plans are being drawn up in Colombia for a number of new tertiary roads in Valle del Cauca Department. A new highway will be built in Valle del Cauca department, while a new road will improve connections between Mulalo and Loboguerrero.
September 12, 2018 Read time: 1 min

Plans are being drawn up in Colombia for a number of new tertiary roads in Valle del Cauca Department. A new highway will be built in Valle del Cauca department, while a new road will improve connections between Mulalo and Loboguerrero.

Related Content

  • New Russian tolled highway planned
    May 8, 2019
    A new 729km tolled highway link is being planned for Russia. The route will be constructed by the Russian roads company, Avtodor and construction should start in 2025. Costing up to US$8.1 billion, the route will connect Moscow with Kazan, the route will run through Valadimir, Murom, Arzamas, Sergach, Kanash and Shali. Around 60% of the budget will be sourced from Federal sources, while private funding should pay for the remaining 40%.
  • Two major Indian highway links under construction
    July 21, 2022
    Two major Indian highway links are under construction.
  • Immersed tunnel planned for Sao Paulo
    August 9, 2012
    Plans are being drawn up for an immersed tunnel close to Sao Paulo in Brazil. The tender process is being initiated to find a consultancy company prepared to handle the engineering design work. The tunnel will connect Santos and Guaruja. The US$6.1 million engineering tender is being offered by Brazilian company Desenvolvimento Rodoviario (Dersa).
  • Delay for tender for link roads to Istanbul’s new Bosporus bridge
    June 25, 2015
    The tender process for the road connections to the third bridge over the Bosporus in Turkey has been delayed once more. This is the third time the tender for the connecting roads for Istanbul's third bridge over the Bosporus has been postponed. The tender for the North Marmara Motorway was originally set for 6th March 2015 but was then pushed back to the 6th May. It was then announced that the tender would be run in two stages, with the Kinali-Odayeri motorway tender on 7th July and the Kurtkoy-Akyazi motor