Skip to main content

Colombia tunnel building work

Excavation work will be complete on a new tunnel stretch in Colombia in Q3 2020.
By MJ Woof May 27, 2020 Read time: 1 min
Work is progressing on Colombia’s Occident Tunnel project - image © courtesy of Wollertz, Dreamstime.com

Driving work will be complete for the second Occident Tunnel section in Colombia during October 2020.

The link forms part of the highway route connecting the city of Medellin with Santa Fe and Uraba. In all, the tunnel will measure 4.6km when it has been bored, with more than 3.6km having already been driven.

The new Autopista al Mar 1 road, including the Occident Tunnel, should be complete by 2022. The project is being managed by Colombia's national infrastructure agency (ANI) and forms part of the country’s road development programme.

Related Content

  • New highway for Ethiopia being constructed
    July 11, 2016
    Construction work on a 130km section of highway is being carried out at present in Ethiopia. The stretch runs between the towns of Awash and the city of Adama, which lie to the east of capital Addis Ababa. The new section of road being built will form part of the highway from Adama to Dire Dewa. The US$544 million project is being managed by the Ethiopian Roads Authority (ERA). The work is needed to improve the route from Addis Ababa to Dire Dewa, which carries a high percentage of heavy truck traffic and i
  • Colombian road project
    April 23, 2012
    Road management firm Ruta del Sol intends to invest US$846 million in Colombia’s Ruta del Sol highway during 2012. The highway connects Colombia’s Central region with the Atlantic coast. Ruta de Sol has already invested $282 million in maintenance works for the 600km or so of existing highway and intends to extend the highway by a further 100km. Ruta de Sol has already opened the first 10km of the highway that forms part of the Sector 2 stretch of the, linking Puerto Salgar (Cundinamarca) to San Roque (Cesa
  • Realising a dream
    February 20, 2012
    Shem Oirere reports on how major highway projects in eastern African will improve links and the economies of a number of countries in the region
  • Procurement open for Northland Corridor
    March 26, 2025
    The Ara Tūhono/Warkworth-to-Te Hana section in New Zealand is the most advanced part of the corridor in terms of consents, property acquisition and design.