Skip to main content

Colombia tunnel building work

Excavation work will be complete on a new tunnel stretch in Colombia in Q3 2020.
By MJ Woof May 27, 2020 Read time: 1 min
Work is progressing on Colombia’s Occident Tunnel project - image © courtesy of Wollertz, Dreamstime.com

Driving work will be complete for the second Occident Tunnel section in Colombia during October 2020.

The link forms part of the highway route connecting the city of Medellin with Santa Fe and Uraba. In all, the tunnel will measure 4.6km when it has been bored, with more than 3.6km having already been driven.

The new Autopista al Mar 1 road, including the Occident Tunnel, should be complete by 2022. The project is being managed by Colombia's national infrastructure agency (ANI) and forms part of the country’s road development programme.

Related Content

  • New bridges, ramp and tunnel for Dubai
    February 19, 2020
    New flyover bridges, a ramp and a tunnel connection are being built in Dubai.
  • Moscow plans road construction work
    October 25, 2019
    A series of road building projects are planned for Russia’s capital, Moscow.
  • New Algerian routes
    November 27, 2012
    A major new expressway will link Tizi-Ouzou in Algeria to the country’s East-West highway. The local authorities have been given a budget of US$623 million for the project. The expressway will connect to the East-West highway at Bouira. The project forms part of the 2010-14 five year plan and is required as the existing route linking Tizi-Ouzou to the East-West highway, the TN 12, is now carrying more vehicles than it was designed for. Meanwhile a feasibility study has been completed for a new six-lane high
  • Bosnia road tunnel under construction
    August 12, 2021
    A key road tunnel link is under construction in Bosnia.