Skip to main content

Colombia road project tender process

The tender process for Colombia’s Buga-Buenaventura fourth generation (4G) toll road project is being planned. The tender for the 114.1km dual carriageway is being handled in two separate stretches however. One of the road stretches will be for a 55.4km section from Buga to Loboguerrero, which is expected to cost US$359.45 million. The 58.7km stretch from Loboguerrero to Buenaventura meanwhile is expected to cost $362.75 million. The Loboguerrero to Buenaventura section of the route includes building a 19km
July 22, 2019 Read time: 1 min

The tender process for Colombia’s Buga-Buenaventura fourth generation (4G) toll road project is being planned. The tender for the 114.1km dual carriageway is being handled in two separate stretches however. One of the road stretches will be for a 55.4km section from Buga to Loboguerrero, which is expected to cost US$359.45 million. The 58.7km stretch from Loboguerrero to Buenaventura meanwhile is expected to cost $362.75 million. The Loboguerrero to Buenaventura section of the route includes building a 19km stretch of dual carriageway, as well as a tunnel measuring 1.4km. The tender process is expected to commence in either the second or third quarter of 2020 and the project will be handled under the PPP model. The project was previously to be constructed the Via Pacifica concession firm but delays resulted in this deal having to be cancelled.

Related Content

  • A tricky road update is planned for an important rural road in Brazil
    September 27, 2013
    Brazilian consultant SOTEPA has been closely involved with infrastructure improvements in a series of projects in the southern state of Santa Catarina. One of the most important of these has been design work for the SC-477 state highway, which connects the east of the state to Brazil’s Littoral zone and the BR-101 federal highway. The SC-477 has had to be upgraded as part of it has been unsurfaced, without an asphalt surface between Itaiópolis and Doutor Pedrinho. The road provides an important link for the
  • East End Crossing Project—Availability payment P3 in action
    July 14, 2017
    Indiana exercised its authority to use a P3 contract when it partnered with Kentucky for new bridges across the Ohio River. Barney Allison and John Smolen* explain the groundbreaking availability payment deal. Earlier this year, traffic began rolling over the new tolled Lewis and Clark Bridge spanning the Ohio River from northern Kentucky to southern Indiana. The cable-stayed bridge is part of the award-winning Ohio Bridges Project to untangle traffic within the greater metropolitan area of Louisville, Kent
  • New tunnel for Colombian capital
    February 3, 2014
    Pre -feasibility studies are commencing for a new tunnel project in Colombia capital Bogota. The tunnel is set to link Bogota’s north side with La Calera and the studies should be completed by April 2014. The project is expected to cost in the region of US$198.76 million to construct and will be for a 4.5km tolled tunnel. The project will be challenging however and will take up to four years to complete. The route will run from Street 170 in northern Bogota, linking the Perimetral Oriental ring road that is
  • Highway traffic management and tunnel safety
    May 14, 2012
    Austria’s new A5 autobahn is now officially open to traffic and the highway is also the first in the country being built under the PPP model. The first 16km stretch of the highway was opened in November 2009 on schedule with the second 35km section now having been opened as well. The contract was carried out by concession company Bonaventura Strassenerhaltungs, a partnership headed by German company Hochtief and Austrian firm Alpine Bau each with 44.4% stakes while French firm Egis Preojects holds the remai