Skip to main content

Colombia road project tender process

The tender process for Colombia’s Buga-Buenaventura fourth generation (4G) toll road project is being planned. The tender for the 114.1km dual carriageway is being handled in two separate stretches however. One of the road stretches will be for a 55.4km section from Buga to Loboguerrero, which is expected to cost US$359.45 million. The 58.7km stretch from Loboguerrero to Buenaventura meanwhile is expected to cost $362.75 million. The Loboguerrero to Buenaventura section of the route includes building a 19km
July 22, 2019 Read time: 1 min

The tender process for Colombia’s Buga-Buenaventura fourth generation (4G) toll road project is being planned. The tender for the 114.1km dual carriageway is being handled in two separate stretches however. One of the road stretches will be for a 55.4km section from Buga to Loboguerrero, which is expected to cost US$359.45 million. The 58.7km stretch from Loboguerrero to Buenaventura meanwhile is expected to cost $362.75 million. The Loboguerrero to Buenaventura section of the route includes building a 19km stretch of dual carriageway, as well as a tunnel measuring 1.4km. The tender process is expected to commence in either the second or third quarter of 2020 and the project will be handled under the PPP model. The project was previously to be constructed the Via Pacifica concession firm but delays resulted in this deal having to be cancelled.

Related Content

  • India’s key tunnel project attracting new bidding
    June 5, 2017
    India’s massive Zojila Tunnel project in Jammu & Kashmir is attracting new bidding. The National Highways & Infrastructure Development Corporation (NHIDC) is asking for new bids for the project. A number of Indian and international firms are expected to enter bids, with some planning join ventures for the work, which is expected to cost US$1.55 billion.
  • French highway project underway
    May 27, 2021
    A key French highway project will get underway shortly
  • Vietnam’s road programme gearing up
    January 7, 2019
    Vietnam’s impressive road development programme is now gearing up, with a series of major projects scheduled to commence in 2019. Work is starting on three key projects: the My Thuan 2 Bridge; the Cam Lo to La Son highway section; the Cao Bo to Mai Son highway section. All three of these projects will form part of the Eastern North-South Expressway, with the work being overseen by the Ministry of Transport (MOT). The My Thuan 2 Bridge will cost some US$214.3 million and will connect Vinh Long Province with
  • S&P Global Rating: credit stability for toll road operators
    August 14, 2017
    The outlook is generally stable for business conditions and credit quality for toll roads worldwide, according to the latest survey from ratings agency S&P Global.The exception is the US where the overall outlook is “positive”, noted the report S&P Global Ratings' 2017. The 21-page report considers broad economic and industry-specific trends. It looks at economic conditions, demographic trends and geopolitical risks that affect the movement of people and goods. “We expect stable or improving, but still frag