Skip to main content

Colombia road project delayed

Delays are afflicting work on the Zaragoza-Caucasia road upgrade project in Colombia. The work was originally due for completion in December 2018 but is now being finished in the second quarter of 2019. Vandalism to 21 construction machines on the project are the prime cause for the delay. New security measures have been put in place to prevent a recurrence. The project involves resurfacing the road stretch as well as building two new intersections and a bypass loop. The work forms part of the US$139 millio
January 29, 2019 Read time: 1 min

Delays are afflicting work on the Zaragoza-Caucasia road upgrade project in Colombia. The work was originally due for completion in December 2018 but is now being finished in the second quarter of 2019. Vandalism to 21 construction machines on the project are the prime cause for the delay. New security measures have been put in place to prevent a recurrence. The project involves resurfacing the road stretch as well as building two new intersections and a bypass loop. The work forms part of the US$139 million, 145km Conexion Norte fourth generation (4G) road project.

Related Content

  • Singapore road and tunnel contracts awarded
    May 29, 2018
    Contracts to construct new stretches of road and tunnels forming part of the North-South Corridor (NSC) project have been awarded by Singapore's Land Transport Authority (LTA). When complete in 2026, the NSC will improve connections between Singapore’s city centre and its northern areas. The link will be Singapore’s first integrated transport link, combining the new road connection for motor vehicles with dedicated bus lanes and cycling facilities. A contract worth close to US$603 million will be carried
  • Brisbane's highway of distinction
    August 2, 2012
    A massive AU$2 billion update of the Gateway Motorway in Queensland is underway to improve an infrastructure stretched by population boom. Report and photographs by Adrian Greeman Just 20 years after the Australian city of Brisbane built its Gateway Motorway with a high slim signature bridge dominating the river skyline, the road is being completely revamped. Some 12km of urban route on the south of the Brisbane River is being expanded to take much increased traffic levels; the north is getting a completely
  • Paraguayan projects proposed
    May 9, 2019
    Transport infrastructure projects in Paraguay are gathering pace. The country’s Ministry for Public Works and Communications says that work for the first two stretches of the Transchaco road upgrade project will commence in the third quarter of 2019. The work is being carried out in eight stretches and is expected to cost a total of US$605 million in all. Funding for the widening work is being provided jointly by the Development Bank of Latin America (CAF) and the IADB. The CAF is providing a package worth
  • Funding provided for Colorado Interstate work
    August 24, 2023
    Funding is being provided for Colorado Interstate work