Skip to main content

China’s US$3.85bn Ya'an-Kangding highway to be completed in 2017

The construction of China’s US$3.85 billion (CNY 23.59 billion) Ya'an-Kangding highway will be completed and put into operation during 2017. Meanwhile, the environmental impact assessment (EIA) report for the 133.97km highway project is said to have been completed.
September 18, 2013 Read time: 1 min
The construction of China’s US$3.85 billion (CNY 23.59 billion) Ya'an-Kangding highway will be completed and put into operation during 2017. Meanwhile, the environmental impact assessment (EIA) report for the 133.97km highway project is said to have been completed.

Related Content

  • World asphalt demand to grow 3.6% a year until 2017
    March 4, 2014
    World demand for asphalt will grow by 3.6% annually until 2017, according to Cleveland market research company The Freedonia Group. This follows a decline in demand between 2007 and 2012 in North America and Western Europe, during the global economic crisis. “Gains will be driven by especially strong growth in consumption in China and other developing countries as they work to improve their transportation infrastructures,” said Freedonia analyst Mariel Behnke.
  • China kick-starts Pakistan’s Gwadar East Bay Expressway
    September 2, 2015
    China is offering an interest-free US$130 million loan to Pakistan for construction of the Gwadar East Bay Expressway in the southwest port of Gwadar. The proposed 19km expressway will connect the Gwadar Port with the Mekran Coastal Highway, passing along the east bay of Gwadar City. The loan is part of a wider financing deal whereby China has a converted $225.5 million loan for the Gwadar International Airport into a loan. Work on the highway is expected to start in November for completion at the
  • Go-ahead for series of Chinese highway deals
    February 2, 2015
    The go ahead has been given for a major highway project in China’s Yunnan Province. The US$3.25 billion highway will connect Shangri-La and Lijiang. The project has received approval from the National Development and Reform Commission of China. In addition, approval has also been given by the National Development and Reform Commission for the $471.8 million Zhejiang section of the highway connecting Hangzhou with Nanjing.
  • Cummins completes China collection
    November 21, 2018
    Cummins has showcased a full line of China Nonroad Stage IV emissions engines with the unveiling of the upgraded high performance 8.9-litre L series engine. The unit moves up to 298kW with a peak torque of 1800Nm – an 11% increase on its predecessor – and offers class-leading fuel economy and the ability to run at high altitudes while maintaining power capability. Cummins full line-up of engines for the new China Nonroad Stage IV emissions standard spans 2.8 to 15 litres displacement with a power capabili