Skip to main content

Canada's new bridge?

Plans are in hand in Canada for a replacement for the Pattullo Bridge.
February 29, 2012 Read time: 1 min
Plans are in hand in Canada for a replacement for the Pattullo Bridge. The current bridge link is ageing and a study has discounted a refurbishment of this structure as not being technically feasible. The bridge crosses the Fraser River and it is hoped that the replacement will be ready by 2020. Various alternatives have been evaluated and a new bridge is considered the most likely. The construction of a new six-lane bridge would cost US$1.03 billion. However, the new bridge might feature four lanes in a bid to cut costs. It is not yet clear whether the bridge would be tolled.

Related Content

  • Philippines’s NEDA to consider two road PPP projects in November
    November 12, 2015
    The National Economic and Development Authority (NEDA) will consider approval of seven Public-Private Partnership (PPP) projects, two of them highways, by the end of this month. The highways are the US$516 million Manila connector road and the $209 million Plaridel toll road. A report by the Manila-based Business World Online newspaper said the deals are worth around US$3.65 billion.
  • Formwork solutions for bridge maintenance and repair
    January 6, 2015
    An array of innovative formwork solutions have helped in the repair and construction of key bridge links - Mike Woof writes Formwork producers are continually developing novel solutions for bridge maintenance and construction applications. Several key structures have benefited from the novel use of formwork systems, with suppliers such as Doka, PERI, Pilosio and RMD all working on important structures in recent times. In Estonia, construction work is underway on the bypass around Tartu, the country’s
  • Massive German road investment required
    March 5, 2025
    German is requiring a massive investment in road development.
  • Bold move aids Ironton-Russell bridge works in U.S.
    January 24, 2014
    The bold decision to go against the norm and build the back spans using falsework for the Ironton-Russell replacement bridge between Parkersburg, Kentucky and Cincinnati, Ohio allowed land access to build the main span which, along with the first use in the U.S. of precast stay anchor blocks, meant the new structure could get built.