Skip to main content

Canada's new bridge?

Plans are in hand in Canada for a replacement for the Pattullo Bridge.
February 29, 2012 Read time: 1 min
Plans are in hand in Canada for a replacement for the Pattullo Bridge. The current bridge link is ageing and a study has discounted a refurbishment of this structure as not being technically feasible. The bridge crosses the Fraser River and it is hoped that the replacement will be ready by 2020. Various alternatives have been evaluated and a new bridge is considered the most likely. The construction of a new six-lane bridge would cost US$1.03 billion. However, the new bridge might feature four lanes in a bid to cut costs. It is not yet clear whether the bridge would be tolled.

Related Content

  • Moscow-Kazan highway plans
    June 17, 2020
    The Moscow-Kazan highway plans form part of the nation’s future economic recovery.
  • Summer paving schedule set for British Columbia
    June 15, 2022
    Around US$40 million will be spent on paving projects by Canada’s Pacific Ocean coast province.
  • Australian Institute of Landscape Architects (AILA) anger over East West Link
    August 6, 2013
    The Australian Institute of Landscape Architects (AILA) fear the design of the proposed multi-billion dollar East West Link highway in Melbourne will have a “substantial visual, environmental and amenity” impact on peoples quality of and the open spaces they enjoy. Kirsten Bauer, president of the AILA Victorian Chapter, has attacked the plans for the 18km tolled motorway, set to run from the western suburbs to the Eastern Freeway, after she and other Victorian AILA members had reviewed the “so called detai
  • Key Indonesia bridge project proves unfeasible
    June 8, 2015
    Proposals to construct the Sunda Strait Bridge are not feasible, according to the Ministry of Energy and Mineral Resources of Indonesia. Safety risks from earthquakes, tsunami, high tides and extreme weather conditions make the project impractical. A US$75.46 million feasibility study was carried out for the project. This pointed out that the bridge is at a high risk from earthquakes and tsunamis due to its vicinity to the Anak Krakatoa volcano.