Skip to main content

California highway project – report published

The environmental impact report for California’s Northwest 138 Corridor Improvement Project has been completed. The report was produced jointly by the California Department of Transportation and the Los Angeles County Metropolitan Transportation Authority.
July 17, 2017 Read time: 1 min

The environmental impact report for California’s Northwest 138 Corridor Improvement Project has been completed. The report was produced jointly by the 2451 California Department of Transportation and the 3227 Los Angeles County Metropolitan Transportation Authority. When the project is complete it will boost safety and cut congestion on SR-138 between the I-5 and SR-14 in the north of Los Angeles County. The area suffers heavily from traffic jams and delays are common for road users. The studies into the options available showed that the best alternative was for the expressway/limited access conventional highway. However the sections of SR-138 that will not be incorporated into the route improvements will now become local access roads.

The plan calls for a six-lane divided Freeway and Expressway running between the I-5 interchange to Gorman Post Road and from Gorman Post Road to 300th Street West. The plan also includes four-lane divided Expressway and Limited Access Conventional Highway from 300th Street West to 240th Street West and from 240th Street West to SR-14. However financing for the work has yet to be established.

Related Content

  • Protest storm over new US$0.5bn Nevada highway
    August 20, 2012
    The most expensive highway ever built in Nevada will open before the end of August to a storm of protest. The new 13.7km Interstate 580 three-lane motorway, which is reported to have cost more than US $0.5 billion to construct, has been dubbed a vanity project by local politicians.
  • Lane in upgrade project near Disney World
    August 8, 2023
    Florida Department of Transportation commissioned Lane for the project that includes realigning the westbound I-4 entrance ramp from southbound Apopka-Vineland Road.
  • Singapore road and tunnel contracts awarded
    May 29, 2018
    Contracts to construct new stretches of road and tunnels forming part of the North-South Corridor (NSC) project have been awarded by Singapore's Land Transport Authority (LTA). When complete in 2026, the NSC will improve connections between Singapore’s city centre and its northern areas. The link will be Singapore’s first integrated transport link, combining the new road connection for motor vehicles with dedicated bus lanes and cycling facilities. A contract worth close to US$603 million will be carried
  • Bulgaria plans for operating road infrastructure
    February 21, 2012
    There is a lot of work to do on Bulgarian roads, but the government has plans to increase the length of highways built each year as Krasimir Krastanov reports. Bulgarian roads with a pavement make up 98.4% of all the country's roads, while 92.5% of them have an asphalt surface and 82.8% of them are able to carry 10tonnes/axle.