Skip to main content

Brunei bridge being built

Work is progressing on the major Temburong Bridge project in Brunei. This bridge will measure nearly 12km in length, with the work being handled by a series of contractors. Both the Chinese contractor China State Construction Engineering Corporation Limited (CSCEC) and the South Korean firm Daelim Industrial are involved in the project. Work being carried out also includes the construction of two viaducts measuring 13.4km. The link is expected to open to traffic in 2019.
August 4, 2017 Read time: 1 min

Work is progressing on the major Temburong Bridge project in Brunei. This bridge will measure nearly 12km in length, with the work being handled by a series of contractors. Both the Chinese contractor China State Construction Engineering Corporation Limited (CSCEC) and the South Korean firm Daelim Industrial are involved in the project. Work being carried out also includes the construction of two viaducts measuring 13.4km. The link is expected to open to traffic in 2019.

Related Content

  • New Central Ring Road around Moscow to be built by 2018
    September 30, 2013
    Eugene Gerden evaluates Moscow’s new ring road mega project The Russian government plans to complete implementation of one of the most ambitious projects in the country’s road building industry in recent years, which involves construction of The Central Ring Road around Moscow by 2018. The new road should be built by the next presidential elections, while its length will be 339km. It is expected to be comprised of five sections and will be located 50km away from Moscow Ring Road, a ring road encircling the
  • Florida turnpike contract for Lane
    July 29, 2022
    Lane Construction has been awarded a Florida turnpike contract.
  • Construction for US$180 million Guinea road
    December 3, 2024
    Construction is underway for a US$180 million Guinea road.
  • North Viaduct completed on UK’s Mersey Gateway bridge project
    April 19, 2017
    Concrete finishing work has started on the completed north approach viaduct of England’s new 2.13km Mersey Gateway project. Over the past three years, around 18,400m³of concrete was used to build the viaduct. When complete near the end of this year, around 60,000 vehicles are expected to use the toll bridge every day, or nearly 22 million vehicles annually.