Skip to main content

Brunei bridge being built

Work is progressing on the major Temburong Bridge project in Brunei. This bridge will measure nearly 12km in length, with the work being handled by a series of contractors. Both the Chinese contractor China State Construction Engineering Corporation Limited (CSCEC) and the South Korean firm Daelim Industrial are involved in the project. Work being carried out also includes the construction of two viaducts measuring 13.4km. The link is expected to open to traffic in 2019.
August 4, 2017 Read time: 1 min

Work is progressing on the major Temburong Bridge project in Brunei. This bridge will measure nearly 12km in length, with the work being handled by a series of contractors. Both the Chinese contractor China State Construction Engineering Corporation Limited (CSCEC) and the South Korean firm Daelim Industrial are involved in the project. Work being carried out also includes the construction of two viaducts measuring 13.4km. The link is expected to open to traffic in 2019.

Related Content

  • US$12.2 billion for new Indian tunnels
    September 18, 2024
    A US$12.2 billion budget is being invested in new Indian tunnel projects.
  • Virginia Interstate highway upgrade project
    February 26, 2019
    A 15km stretch of Interstate 64 in the US state of Virginia will be upgraded, allowing it to handle more traffic.
  • Kazakhstan contract awarded to consortium
    June 5, 2018
    A consortium will handle the contract to build a new beltway project for Kazakhstan’s capital, Almaty. The US$730 million project will be carried out by the consortium, which comprises the South Korean firms SK Engineering & Construction (SK E&C) and Korea Expressway and the Turkish contractors Makyol Group and Alarko Holding. The contract has been awarded under the build-operate-transfer model as a 20-year deal.
  • Design contract awarded for Indian bridge project
    March 26, 2018
    A major design contract has been awarded for a key bridge project in India. Consulting engineer COWI has been awarded the contract for the detailed design of the 10.3km Package 1 section of the new link. Meanwhile the Danish consultant Rambøll is to carry out work on the design for the 7.8km Package 2 section of the Mumbai Trans Harbour Link (MTHL). The Owner for MTHL is Mumbai Metropolitan Region Development Authority (MMRDA) The 22km link will be India's longest sea bridge and is expected to cost around