Skip to main content

Brunei bridge being built

Work is progressing on the major Temburong Bridge project in Brunei. This bridge will measure nearly 12km in length, with the work being handled by a series of contractors. Both the Chinese contractor China State Construction Engineering Corporation Limited (CSCEC) and the South Korean firm Daelim Industrial are involved in the project. Work being carried out also includes the construction of two viaducts measuring 13.4km. The link is expected to open to traffic in 2019.
August 4, 2017 Read time: 1 min

Work is progressing on the major Temburong Bridge project in Brunei. This bridge will measure nearly 12km in length, with the work being handled by a series of contractors. Both the Chinese contractor China State Construction Engineering Corporation Limited (CSCEC) and the South Korean firm Daelim Industrial are involved in the project. Work being carried out also includes the construction of two viaducts measuring 13.4km. The link is expected to open to traffic in 2019.

Related Content

  • New Russian bridge to span Volga
    July 6, 2020
    A new Russian bridge is planned to span the River Volga.
  • VIDEO: Gap closed for Gordie Howe Bridge
    July 26, 2024
    A 26m gap in the deck was recently closed on the bridge that will connect Detroit in the US state of Michigan and Windsor in the Canadian province of Ontario.
  • Chinese funding for Bolivia roads
    October 14, 2015
    Bolivia is looking to source funding for two major highway projects from China. This development could follow discussions between Bolivia's vice-president Alvaro Garcia Linera and Chinese funding bodies being held during his trip to China. The highways in focus are the links from Porvenir to Chive and from Chive to Ixiamas. The 151km Porvenir to Chive highway is expected to cost around US$385 million to construct. The 254km Chive to Ixiamas highway meanwhile is expected to cost $600 million. Should Chinese
  • Grimsby’s Corporation Bridge work extended
    March 6, 2024
    Refurbishment of the nearly 100-year-old bascule bridge in northern England is being done by Spencer Group with project management by Equans.