Skip to main content

Bridge under discussion for UK’s River Thames

Engineering specialist AECOM will carry out a study into the proposed Lower Thames Crossing project in the UK.
June 19, 2012 Read time: 3 mins

Engineering specialist 1397 AECOM will carry out a study into the proposed Lower Thames Crossing project in the UK.

The contract was awarded by the 5432 Department for Transport and is to review the Lower Thames Crossing capacity options. AECOM’s task requires a range of technical skills including transport planning, highway engineering and environmental studies and is expected to take 12 months to complete. The Dartford River Crossing was first opened in 1963, a second tunnel followed in 1980 and the Queen Elizabeth Bridge became operational in 1991. The objective of this study is to help develop the longer-term strategy for the crossing. The study will consider options to provide additional river crossing capacity in the lower Thames area. It is intended the study will help inform public consultation on options during 2013.

The Lower Thames Crossing was proposed in 1989 in the Roads to Prosperity paper but this was then cancelled in the early 1990s. Three main options have been proposed in the past, all with locations to the east of the existing Queen Elizabeth Bridge. Two of these options would connect from an existing dual carriageway close to Tilbury on the north of the Thames and then take different routes to link with the A2/M2 to the south. One of these last options would also connect with the M20.

There are a range of factors to consider, including the fact that the routes would have to negotiate protected areas. The Lower Thames Crossing would also have to be designed so as not to impede flights to and from London City Airport. One of the earlier designs proposed the use of a concrete box girder bridge, which would feature a low profile and therefore not infringe on the flightpath for the airport. But the span required would have put the structure at the very limit of the technology available at the time using the concrete box girder bridge design. There were concerns over its structural strength, which were highlighted following a series of problems with wide span, concrete box girder bridges built along similar lines at the time. There were also criticisms that this comparatively cheap construction method would result in an ugly bridge that would be at odds with aesthetic sensitivities.

The design and construction techniques surrounding concrete box girder bridges have improved since the early 1990s and it seems feasible that such a structure featuring the required span might now be practical without sacrificing strength, capacity or design life. But it might still attract negative comment over its appearance and with approvals being a necessary part of its eventual construction, could well prove yet another barrier to the project. While cable-stayed bridges are favoured on grounds of aesthetics and also offer manageable costs if built along conventional lines, such a structure could intrude within the safety parameters for the flightpath into the airport. It was for this particular reason that the concrete box girder design was favoured over a cable-stayed alternative when the project was first put forward in the late 1980s. Another proposal has been to include the crossing as part of the proposed Thames Barrier but this may face further obstacles on various environmental grounds as well as cost issues.

Balancing all the factors for the project will be a complex task and AECOM is likely to put forward various options. At this stage however it seems likely that the concrete box girder option, however ugly, will be cheapest and simplest and with costs of any new transport connection under the spotlight due to the UK’s tough budgetary constraints, it will have a very strong case in its favour.

For more information on companies in this article

Related Content

  • Curved girders for the Gaasperdammerweg A9 section in Amsterdam
    May 22, 2018
    Dutch authorities recently needed to add traffic lanes to two flyovers at the Holendrecht junction on the Gaasperdammerweg section of the A9 motorway in Amsterdam It was in November 2014 that the Directorate-General for Public Works and Water Management of the Netherlands Rijkswaterstaat awarded the A9 Gaasperdammerweg public-private-partnership project to IXAS Zuid-Oost, a consortium consisting of Ballast Nedam, Fluor, Heijmans and 3i Infrastructure. The A9 Gaasperdammerweg project is the third section
  • UK report suggests 30km Pennine tunnel with robotic maintenance
    December 2, 2015
    The UK could build one of Europe’s longest road tunnels as it considers route options for a new major link connecting the cities of Manchester and Sheffield in England. An interim report looking at how best to connect the cities suggested that the road could be between 40km-50km, depending on the route. It “will include a tunnelled section, which could range from between 20-30km, making it one of the longest road tunnels ever built”.
  • 2015 IRF Global Road Achievement Awards Laureate
    September 15, 2015
    Commuter traffic in the Taipei Metropolitan Area is a major concern for the city’s town planners. In 2009, a decision was reached to widen National Freeway No. 1 between Wugu and Yangmei on a 42km section of freeway on the northern part of town. The lane-widening project saw the construction of two new viaducts built along each side of the freeway. From the onset, the project presented tremendous challenges owing to various factors, including limited space for construction; passing through a geologically
  • Extra funding worth €370 million found for Italian bridge project
    December 8, 2023
    Extra funding worth €370 million is being provided for a key Italian bridge project.