Skip to main content

Bridge under construction collapses in Nepal

February 28, 2012 Read time: 1 min
A bridge under construction linking Bhoteodar and Bharate in Nepal's Lamjung District has collapsed. The bridge is located in Western Nepal and spans the Marsyangdi River. Work on the truss type bridge commenced in February 2009 and the structure has a span of 65m and is 4m wide. At the time of the collapse, 25 construction workers were at the site and three are posted as missing while two were injured and were taken to hospital for treatment. Officials at the western divisional road office in Damauli say that the cause of the collapse will be known following completion of a detailed investigation. The contractor involved in the project is Radha Construction.

Related Content

  • Successful explosive demolition of old bridge in US state of Missouri
    December 16, 2013
    A successful explosive demolition has been carried out of the Hurricane Deck Bridge in the US state of Missouri. The Hurricane Deck Bridge carried Missouri Route 5 over Lake of the Ozarks and measured 695m long. The structure was no longer able to cope with the traffic volumes it was carrying and the Missouri Department of Transport (MODOT) opted to build a new delta frame bridge to replace it. Work started on the new bridge in 2012 and this was opened to traffic in September 2013. The steel span Hurricane
  • Brazil’s Serra do Cafezal Highway
    July 29, 2015
    Brazil's improved Mercosur route will boost capacity and cut travel time - Mauro Nogarin writes. The Régis Bittencourt Highway is one of the main access routes of the Mercosur traffic. It has a length of 400km and connects the main cities of São Paulo and Curitiba, which allows for products to enter from the southeast toward the rest of the southern part of Brazil and later transit to Argentina, Paraguay and Uruguay. Products also flow into Brazil from Mercosur through this major highway. The cost of the hi
  • Greenlight for Vietnam’s Cat Lai Bridge in 2020
    September 4, 2019
    An agreement has been reached in Vietnam for construction of a bridge over the Dong Nai River close to Ho Chi Minh City. The proposed 4.5km, six-lane cable stayed structure – the Cat Lai Bridge - could cost as much as US$268 million. It would replace the Cat Lai ferry service that runs between Nhon Trach District of Dong Nai Province and District 2 of Ho Chi Minh City. The bridge would also become a major route to the international airport, according to local media. The ferry service carries on averag
  • Peru’s Matarani – Punta de Bonbon Highway
    January 5, 2016
    A major new highway project in Peru will improve connectivity for the Arequipa region - Mauro Nogarin writes Peru’s Matarani-Bonbon road project is an important route and forms part of the Camana - Dv Quilca - Ilo - Tacna highway project. The road stretches through several provinces in the Arequipa region. The deadline for completing the work is 720 days after January 2015, and it is scheduled to be completed by December 2016. Progress has been good and as of July 2015, it was 80% completed. The main