Skip to main content

Bridge under construction collapses in Nepal

February 28, 2012 Read time: 1 min
A bridge under construction linking Bhoteodar and Bharate in Nepal's Lamjung District has collapsed. The bridge is located in Western Nepal and spans the Marsyangdi River. Work on the truss type bridge commenced in February 2009 and the structure has a span of 65m and is 4m wide. At the time of the collapse, 25 construction workers were at the site and three are posted as missing while two were injured and were taken to hospital for treatment. Officials at the western divisional road office in Damauli say that the cause of the collapse will be known following completion of a detailed investigation. The contractor involved in the project is Radha Construction.

Related Content

  • Bridge projects planned for Indonesia
    January 9, 2014
    Two important bridge projects are planned for Indonesia. The South Korean firm Samsung is keen to build a 6.7km bridge to link Bintan Island with the free trade zone (FTZ) located in Batam Island. The copmany has been in discussions with the Indonesian Government with regard to the project, which will also include developing a container port in Batam's Tanjung Sauh and is likely to cost in the order of US$576.5 million in all. Meanwhile plans are in hand for a new 600m bridge to be developed in Jayapura. Th
  • Construction to start on Hungary’s revamped M4 project in 2016
    July 7, 2015
    The Hungarian government has announced that it will restart work on a new section of the M4 dual carriageway between Albertirsa and Ullo in 2016. Hungarian media reported that the government will invest around €192 million and no funding will come from the European Union, of which the country is a member. The two towns are around 25.5km apart, with Albertirsa closest to the capital Budapest at around 60km. The project should be finished some time in 2019, according to Hungarian media. The announcem
  • Malaysia bridge construction project now commencing
    November 8, 2017
    Construction work is commencing on a key contract in Malaysia to build a new bridge. The US$106.4 million project is being handled by the contractor Naza EC and is for the construction of the 1.5km long Bagan Datuk Bridge, as well as an 8.7km long link road. The work is intended to improve transport connections between Malaysia’s Bagan Datuk, Perak Tengah, and Manjung districts. Once complete, the new link will reduce journey times for drivers from one hour at present to just 15 minutes.
  • Tyne tunnel's water quality checks
    February 6, 2012
    Five buoy-mounted automatic water quality monitors (AWQMs) have been installed by YSI Hydrodata engineers at the new Tyne Tunnel project in north-east England. The equipment on the second vehicle tunnel under the River Tyne, currently one of the UK's largest construction projects, aims to ensure that construction operations do not significantly affect river water quality. Unusually, the contractors have not taken ownership of the instrumentation, preferring instead to simply purchase the data and alarms. Th