Skip to main content

Brazilian bridge being built

In Brazil the firm EcoRodovias has won the tender process for the Rio-Niteroi bridge contract. The Brazilian road management firm was awarded the tender for the Rio-Niteroi contract, with its proposed low charge for each user of the bridge. The company will take over management of the route from May 2015, for a period of 30 years. The tariff charged for light vehicles will immediately drop from the current US$1.61 (BRL 5.20) to $1.15 (BRL 3.70) when EcoRodovias takes over from CCR, which has the contract fo
March 23, 2015 Read time: 1 min
RSSIn Brazil the firm 2688 EcoRodovias has won the tender process for the Rio-Niteroi bridge contract. The Brazilian road management firm was awarded the tender for the Rio-Niteroi contract, with its proposed low charge for each user of the bridge. The company will take over management of the route from May 2015, for a period of 30 years. The tariff charged for light vehicles will immediately drop from the current US$1.61 (BRL 5.20) to $1.15 (BRL 3.70) when EcoRodovias takes over from CCR, which has the contract for the bridge at present. CCR presented the weakest offer of the six groups participating in the tender. The Nova Guanabara consortium placed second in the tender process. EcoRodovias is expected to invest $402.5 million (BRL 1.3 billion) in the road over the course of the contract.

For more information on companies in this article

Related Content

  • Thailand-Laos-China connection
    March 21, 2012
    Work is now underway once more on a new bridge link connecting Laos with Thailand. The US$44 million project is being funded equally by the governments of both countries and work is expected to be complete in June 2013.
  • River level monitoring to reduce scour risk
    July 11, 2022
    An OTT ecoLog 1000 water level logger with cellular data connection to Hydromet Cloud was trialled upon the Vales Burn Bridge in Scotland
  • New bridge planned for Yakutsk in Siberia
    April 12, 2013
    A new 3km long bridge is planned for Yakutsk in Siberia. This bridge will cross the River Lena and is at present expected to cost some US$1.74 billion to construct. The tender process for the project was initially to be held until the end of 2013. The timing of the tender process for the two lane bridge will now be announced in due course. Design and construction is expected to take six years once the contract is signed. Drivers will not pay tolls to use the bridge and instead the investor will be paid fees
  • US increased transportation budget proposals
    July 12, 2012
    IRF's Washington Programme Centre provides an update on some latest developments in the 2010 Budget plan There has been further recent action from both Congress and the White House on budget plans that will guide the Transportation Reauthorization Bill for the next six years. On 7 May, President Obama proposed large increases for rail and highways in his 2010 Budget plan, including the largest amount of funding that any President has sought for Amtrak, or for the development of high-speed rail in the United