Skip to main content

Brazil transportation programme

Plans are being formulated in Brazil for second phase of the country’s logistics investment programme, PIL. This looks set to include 15 road sections, 11 of which are still in the project development phase. Other sections are in the public consultation phase, or waiting to be analysed by the Brazilian authorities. The projects for the BR 476-153-282-480 sections in Parana and Santa Catarina states are ready to be put to tender. Meanwhile the BR 364-365 sections in Goias and Minas Gerais states, are current
March 10, 2016 Read time: 2 mins
Plans are being formulated in Brazil for second phase of the country’s logistics investment programme, PIL. This looks set to include 15 road sections, 11 of which are still in the project development phase. Other sections are in the public consultation phase, or waiting to be analysed by the Brazilian authorities. The projects for the BR 476-153-282-480 sections in Parana and Santa Catarina states are ready to be put to tender. Meanwhile the BR 364-365 sections in Goias and Minas Gerais states, are currently being analysed by the Brazilian authorities. These two sections are expected to be offered in tenders in the first half of 2016. Meanwhile the remaining 13 sections are set to be offered in tenders in the second half of 2016. Road sections in the programme total some 7,000km and include investments of around US$17.56 billion in all. The second phase of the PIL programme also includes concessions for five railway sections and four airports in the states of Rio Grande do Sul, Santa Catarina, Ceara and Bahia.

Related Content

  • GPS machine control paves the way for Turkish canal
    February 7, 2012
    GPS machine control for earthworks and concrete paving is helping to fast track construction of an irrigation canal in Turkey - Claire Symes reports. The Turkish economy is expected to flourish as a result of construction of a new irrigation channel currently underway in the east of the country. This canal is benefiting from the latest concrete paving and earthmoving technology and will bring with it prosperity to a deprived area of the country. But the project is already taking the lead in terms of Turkish
  • Solving Sao Paulo's traffic congestion problems
    July 10, 2012
    The Brazilian city of Sao Paulo suffers a heavily congested road network. Huge traffic jams up to 100km long are common and can be even 200km long in bad weather or at weekends and holidays. Of the 1.1 million vehicles that drive into Sao Paulo every day, almost a third are passing through and the new Rodoanel Mario Covas orbital route is intended to tackle the problem. This is a 170km long highway around the city that will connect the 10 highways linking Sao Paulo and allow many vehicles to avoid the conge
  • Liebherr achieves record turnover in 2012
    April 10, 2013
    The Liebherr Group achieved its highest turnover in its history in 2012. Turnover climbed over than 9% to €9.1 billion, while the company invested a total of €840 million in its operations. The 2012 business year progressed well for the Liebherr Group. Although the reduced dynamism of the world economy had a noticeable effect on orders received in the final months of the year, this no longer influenced turnover significantly. The Group increased its total turnover in the past business year by more than €760
  • Funding road research in Kenya as infrastructure development grows
    August 14, 2017
    The demand for road construction material research and testing services in Kenya is expected to soar. The East African country is going through a construction boom, despite policy and financial challenges facing public institutions overseeing the research and testing operations in the transport industry. “Kenya is going through a construction boom and so is the demand for construction material testing services,” said Juma Ali Madzitsa, Geotechnical Lab Supervisor at SGS Kenya, a subsidiary of Swiss based in