Skip to main content

Bay Bridge demolition underway in California

Demolition of the Bay Bridge in California is underway at present. A new cable stayed structure now carries traffic and the old steel cantilever bridge is being dismantled piece by piece. The work is being carried out in stages so as to maximise safety and also to meet the tough environmental legislation that forbids any waste material accidentally falling into the waterway. The dismantling process is taking three years in all to complete.
June 26, 2014 Read time: 1 min
Demolition of the Bay Bridge in California is underway at present. A new cable stayed structure now carries traffic and the old steel cantilever bridge is being dismantled piece by piece. The work is being carried out in stages so as to maximise safety and also to meet the tough environmental legislation that forbids any waste material accidentally falling into the waterway. The dismantling process is taking three years in all to complete.

Related Content

  • NLMK develops new thinner plate steel product
    February 10, 2016
    Belgium-based steel producer NLMK Clabecq has developed a new thickness for its Quard steel product range. This development follows on from the firm’s heavy investment in its steel rolling facility. The surface quality of this plate steel is said to be very high also and the firm claims that the finish of steel from rivals has a rougher finish. Marketing manager Bernard Robins said, “It enables us to produce thin plates with thicknesses from 3.2mm.” and he added, “We are the only ones in the world able t
  • NLMK develops new thinner plate steel product
    January 6, 2017
    Belgium-based steel producer NLMK Clabecq has developed a new thickness for its Quard steel product range. This development follows on from the firm’s heavy investment in its steel rolling facility. The surface quality of this plate steel is said to be very high also and the firm claims that the finish of steel from rivals has a rougher finish. Marketing manager Bernard Robins said, “It enables us to produce thin plates with thicknesses from 3.2mm.” and he added, “We are the only ones in the world able t
  • Efficient recycling with FAE
    June 11, 2020
    FAE has updated its heavyweight, multitask attachment with improvements to the systems that control working depth and water injection
  • Sterling wins accelerated bridge deal in Utah
    April 15, 2021
    Ralph L. Wadsworth Construction has won a US$122.7 million design-build project in the US.