Skip to main content

Bay Bridge demolition underway in California

Demolition of the Bay Bridge in California is underway at present. A new cable stayed structure now carries traffic and the old steel cantilever bridge is being dismantled piece by piece. The work is being carried out in stages so as to maximise safety and also to meet the tough environmental legislation that forbids any waste material accidentally falling into the waterway. The dismantling process is taking three years in all to complete.
June 26, 2014 Read time: 1 min
Demolition of the Bay Bridge in California is underway at present. A new cable stayed structure now carries traffic and the old steel cantilever bridge is being dismantled piece by piece. The work is being carried out in stages so as to maximise safety and also to meet the tough environmental legislation that forbids any waste material accidentally falling into the waterway. The dismantling process is taking three years in all to complete.

Related Content

  • Zhejiang Jiashao Bridge Investment & Development Co
    April 6, 2017
    Located in Zhejiang Province of China, Jiashao Bridge spans the Qiantang River and connects the cities of Jiaxing and Shaoxing. The total length of the bridge project is 10.14km and carries an eight-lane expressway The Qiantang River suffers from a high flow rate of up to 7.5m/s. As the tidal range is around 7-9m, the water depth is less than 2m in time of low level tide, so ships can only move at high tide and large scale ship-lifting equipment cannot be used downstream of Jiashao Bridge. However, to
  • Nigeria’s giant city Lagos to benefit from a new cable-stayed bridge
    September 19, 2012
    The first cable-stayed bridge in Nigeria will link two districts of the megacity of Lagos Nigeria’s first cable-stayed bridge, the Lekki Ikoyi Bridge in the megacity of Lagos is scheduled for completion at the end of 2012. Its striking 90m high pylon characterises the appearance of the 1,357m long bridge, which will connect two districts of the West African city, Lekki on the Lekki Peninsula and Ikoyi on Lagos Island.
  • Cold milling popular for road materials recycling
    July 4, 2012
    Milling techniques remain one of the most widely used recycling methods Well-proven, cold milling techniques remain one of the most widely used methods for materials recycling in road construction. Milled road materials can be cleaned up and re-used in both asphalt and concrete highway construction. German firm Wirtgen has long dominated the market for road milling machines and has the largest share of the sector (as well as the broadest product range), although other firms based in Europe and the US are be
  • Cold milling popular for road materials recycling
    March 2, 2012
    Milling techniques remain one of the most widely used recycling methods