Skip to main content

Bay Bridge demolition underway in California

Demolition of the Bay Bridge in California is underway at present. A new cable stayed structure now carries traffic and the old steel cantilever bridge is being dismantled piece by piece. The work is being carried out in stages so as to maximise safety and also to meet the tough environmental legislation that forbids any waste material accidentally falling into the waterway. The dismantling process is taking three years in all to complete.
June 26, 2014 Read time: 1 min
Demolition of the Bay Bridge in California is underway at present. A new cable stayed structure now carries traffic and the old steel cantilever bridge is being dismantled piece by piece. The work is being carried out in stages so as to maximise safety and also to meet the tough environmental legislation that forbids any waste material accidentally falling into the waterway. The dismantling process is taking three years in all to complete.

Related Content

  • Final beam for Gerald Desmond replacement
    June 18, 2020
    The final steel beam has been installed for the replacement Port of Long Beach bridge - California’s first cable-stayed bridge for vehicles.
  • Sustainable road development in discussion at Intermat
    February 27, 2012
    An in-depth congress is being held in conjunction with the Intermat exhibition. Visitors to the show will be able to find out about the latest developments in sustainable road construction by attending this congress, which is being organised by the Committee for European Construction Equipment (CECE).
  • Bechtel achieves tricky bridge replacement in tight timeframe
    March 21, 2012
    Contractor Bechtel has worked with Network Rail to complete a major road bridge upgrade in the UK. A construction team worked 104 hours consecutively to replace the bridge, located at Reading Station.
  • New Californian bridge
    February 7, 2012
    Plans are in hand for a new bridge to replace the Gerald Desmond Bridge at the Port of Long Beach in California. The existing structure is not able to cope with anticipated increases in vehicle traffic volumes and is also too low for new generation of cargo ships to pass underneath.