Skip to main content

Balfour works nights on Scotland’s Perth Transport Futures project

The Perth Transport Futures project has reached a milestone with the placing of steel beams to support the road bridge on Scotland’s A9 dual carriageway.
July 31, 2017 Read time: 2 mins
Up and in place for steel support beams on the Perth Transport Futures project

The Perth Transport Futures project has reached a milestone with the placing of steel beams to support the road bridge on Scotland’s A9 dual carriageway.

International construction group 1146 Balfour Beatty recently completed the work over three consecutive nights to position the three 103tonne beams.

Balfour Beatty is undertaking the work on behalf of Perth and Kinross Council under the Scape National Civil Engineering and Infrastructure Framework.

On completion, the project will see the creation of a new junction on the A9 dual carriageway, as well as a new link road. This will enable access to development land to the west of the city and support growth in Scotland’s third busiest region.

Hector Macaulay, Balfour Beatty’s Scotland regional managing director, said the company has engaged more than 50 local suppliers and subcontractors. Balfour Beatty sourced all of its steel from British manufacturers, with over half originating in Scotland.

<%$Linker:

2

 

External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Perth Transport Futures Project false http://www.perthtransportfutures.co.uk/ false false%> has four phases and include development of the Cross Tay Link Road around Perth. Phase 1 has been developed by the council's roads infrastructure team and designed by consultants CH2M. It includes a grade-separated interchange between the A9 and the A85 roads as well as a bridge over the River Almond.

 

For more information on companies in this article

Related Content

  • New quenched and tempered steels from NLMK Clabecq
    January 6, 2017
    NLMK Clabecq is launching new quenched and tempered steel products in 2013, with wider ranges of thicknesses and grades. During 2013, the Belgian specialist in thin and large steel plates intends to introduce superior grades for Quard, its abrasion resistant steel and Quend, its high yield strength steel. These introductions will to the range of solutions for heavy machinery manufacturers. Marketing manager Bernard Robins said, “Tests we are conducting with manufacturers are very positive. Welding our steel
  • New quenched and tempered steels from NLMK Clabecq
    February 5, 2013
    NLMK Clabecq is launching new quenched and tempered steel products in 2013, with wider ranges of thicknesses and grades. During 2013, the Belgian specialist in thin and large steel plates intends to introduce superior grades for Quard, its abrasion resistant steel and Quend, its high yield strength steel. These introductions will to the range of solutions for heavy machinery manufacturers. Marketing manager Bernard Robins said, “Tests we are conducting with manufacturers are very positive. Welding our steel
  • VIDEO: Kangaroo takes out cyclist down under
    July 25, 2016
    It caught all the cyclists by surprise when a young bounding kangaroo decided to hurl itself at the peloton during a bicycle race in Australia. A fellow racer trailing behind took the video. The targeted cyclist was severely bruised from hitting the deck and he needed stitches. But the marauding kangaroo apparently died from its injuries when it slammed into the bike at a right angle. Cyclists being taken out by kangaroos is more common than most non-Australians would think. Click here to see one cycl
  • INTERMAT launch for Topcon total stations
    January 6, 2017
    A new range of reflectorless total stations has been developed by Topcon. Called the ES series, the new models also feature TSshield – a Topcon Group innovation using a multi-function telematics-based communication module that locates the instrument.