Skip to main content

Balfour works nights on Scotland’s Perth Transport Futures project

The Perth Transport Futures project has reached a milestone with the placing of steel beams to support the road bridge on Scotland’s A9 dual carriageway.
July 31, 2017 Read time: 2 mins
Up and in place for steel support beams on the Perth Transport Futures project

The Perth Transport Futures project has reached a milestone with the placing of steel beams to support the road bridge on Scotland’s A9 dual carriageway.

International construction group 1146 Balfour Beatty recently completed the work over three consecutive nights to position the three 103tonne beams.

Balfour Beatty is undertaking the work on behalf of Perth and Kinross Council under the Scape National Civil Engineering and Infrastructure Framework.

On completion, the project will see the creation of a new junction on the A9 dual carriageway, as well as a new link road. This will enable access to development land to the west of the city and support growth in Scotland’s third busiest region.

Hector Macaulay, Balfour Beatty’s Scotland regional managing director, said the company has engaged more than 50 local suppliers and subcontractors. Balfour Beatty sourced all of its steel from British manufacturers, with over half originating in Scotland.

<%$Linker:

2

 

External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Perth Transport Futures Project false http://www.perthtransportfutures.co.uk/ false false%> has four phases and include development of the Cross Tay Link Road around Perth. Phase 1 has been developed by the council's roads infrastructure team and designed by consultants CH2M. It includes a grade-separated interchange between the A9 and the A85 roads as well as a bridge over the River Almond.

 

For more information on companies in this article

Related Content

  • New emission compliant dozers are offered by Dressta
    January 6, 2017
    Dressta is now offering versions of its well-proven bulldozer range equipped with Tier 4 Interim/Stage IIIB emission compliant engines. The TD-25, TD-20, TD-15 and TD-14 class dozers will all be available with Tier 4 Interim/Stage IIIB emission rated diesels during 2013. The company says that its TD-10, TD-9, TD-8 and TD-7 bulldozers will be available with Tier 4 Interim/Stage IIIB engines in 2014, while these models will also be revamped with new hydrostatic drivelines. The TD-40 and TD-25 will remain avai
  • New emission compliant dozers are offered by Dressta
    February 7, 2013
    Dressta is now offering versions of its well-proven bulldozer range equipped with Tier 4 Interim/Stage IIIB emission compliant engines. The TD-25, TD-20, TD-15 and TD-14 class dozers will all be available with Tier 4 Interim/Stage IIIB emission rated diesels during 2013. The company says that its TD-10, TD-9, TD-8 and TD-7 bulldozers will be available with Tier 4 Interim/Stage IIIB engines in 2014, while these models will also be revamped with new hydrostatic drivelines. The TD-40 and TD-25 will remain avai
  • Haver & Boecker is adding to its screen range with wire and polyurethane screen decks
    February 8, 2013
    Haver & Boecker is expanding its screen range with the addition of the Ty-Wire hybrid screen deck and of ultrasound screen decks. Ty-Wire hybrid screens use wire that is covered in polyurethane, providing a greater open area than a standard PU screen but with a lifetime that can be 4-6 times longer.
  • Rapid International to highlight mixer and mobile batch plant
    January 6, 2017
    Among Rapid International’s will be the Rapid RP375 planetary mixer, which is said to be popular with both the precast and ready-mix industries. The Rapid RP375 mixer's planetary mixing action produces a homogenous mix ensuring high quality concrete every time, says the company, which will also offer information on the new Rapid Transbatch, the latest model from its mobile batching plant range.