Skip to main content

Balfour works nights on Scotland’s Perth Transport Futures project

The Perth Transport Futures project has reached a milestone with the placing of steel beams to support the road bridge on Scotland’s A9 dual carriageway.
July 31, 2017 Read time: 2 mins
Up and in place for steel support beams on the Perth Transport Futures project

The Perth Transport Futures project has reached a milestone with the placing of steel beams to support the road bridge on Scotland’s A9 dual carriageway.

International construction group 1146 Balfour Beatty recently completed the work over three consecutive nights to position the three 103tonne beams.

Balfour Beatty is undertaking the work on behalf of Perth and Kinross Council under the Scape National Civil Engineering and Infrastructure Framework.

On completion, the project will see the creation of a new junction on the A9 dual carriageway, as well as a new link road. This will enable access to development land to the west of the city and support growth in Scotland’s third busiest region.

Hector Macaulay, Balfour Beatty’s Scotland regional managing director, said the company has engaged more than 50 local suppliers and subcontractors. Balfour Beatty sourced all of its steel from British manufacturers, with over half originating in Scotland.

<%$Linker:

2

 

External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Perth Transport Futures Project false http://www.perthtransportfutures.co.uk/ false false%> has four phases and include development of the Cross Tay Link Road around Perth. Phase 1 has been developed by the council's roads infrastructure team and designed by consultants CH2M. It includes a grade-separated interchange between the A9 and the A85 roads as well as a bridge over the River Almond.

 

For more information on companies in this article

Related Content

  • Tees Valley crossing project consultation nears an end
    May 9, 2019
    Public consultation is nearly closed for a possible new crossing across the River Tees in northern England that could cost upwards of €350 million. A €230-290 million Tees Viaduct Capacity Enhancement project is the preferred option against a €350 million Tees Viaduct option, according to the recently created Tees Valley Combined Authority, the local government. Capacity Enhancement project would see a two-lane bridge built parallel to the existing A19 viaduct to carry traffic travelling northbound an
  • Sennebogen expands network with new Indonesian dealer
    January 6, 2017
    PT Gaya Makmur Tractors is now selling Sennebogen Green Line and Crane Line machines as the German company’s new distributor for Indonesia, based in the capital Jakarta. According to Sennebogen, thanks to the planned govermental infrastructure investments of US$465 billion between now and 2025, the largest country in south-east Asia has a great deal of potential for business and investment. The signing of the dealer contract, completed at bauma 2013, was preceded by extensive training and education of local
  • Sennebogen expands network with new Indonesian dealer
    April 22, 2013
    PT Gaya Makmur Tractors is now selling Sennebogen Green Line and Crane Line machines as the German company’s new distributor for Indonesia, based in the capital Jakarta. According to Sennebogen, thanks to the planned govermental infrastructure investments of US$465 billion between now and 2025, the largest country in south-east Asia has a great deal of potential for business and investment. The signing of the dealer contract, completed at bauma 2013, was preceded by extensive training and education of local
  • Hillhead 2020 in the England will be even bigger than the 2018 event
    July 26, 2019
    On the back of a record-breaking event in 2018 the organisers of the UK’s Hillhead Exhibition have extended the event once again for 2020. The 2018 event was supported by 546 exhibitors and attracted an independently audited attendance of nearly 20,000. With outdoor space on track to be sold out by late autumn, an additional 2,200m² of stand space has been created in the quarry floor by extending the showground into the quarry face demonstration area. Hillhead 2020 takes place from 23–25 June, 202